Skip to content
GullySales

Waterproofing and roofing contractors · CRM

Every inspection, quotation and committee date in one place a supervisor will open.

A CRM for a waterproofing or roofing contractor is the record of every enquiry, inspection, quotation and past job, kept where the office and the supervisors can both see it. GullySales sets up the stages, fields and reminders around how your jobs actually move, and chooses the tool only after that is drawn.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Realistic editorial illustration of waterproofing and roofing contractors at work in India

Last updated 14 Nov 2026.

For waterproofing and roofing contractors

Where it usually goes wrong, and what we would do.

  • “The diary lives in one head”

    Enquiries sit on paper, inspection dates in the owner's phone, quotations in a folder on a desk. When the owner is on a terrace, nobody in the office can say which committee is waiting for a reply or which builder asked for a revised scope.

  • “A job is a building, and the building has a history”

    The same terrace gets an inspection, a quotation, a job, a warranty, a check a few monsoons later and perhaps a repeat. A record built around the phone call loses that thread. Build it around the address and the people attached to it.

  • “The stages are not those of a shop sale”

    Enquiry, photographs received, inspection done, report sent, quotation sent, presented to the committee, approved, scheduled, finished, warranty check. Generic stages such as new, contacted and won hide the place where your jobs actually stall.

  • “Rain buries the notes”

    In the first heavy week the phone rings without pause and quotations from March are forgotten. A record that depends on memory fails at exactly the time the office is busiest.

What we do

What we deliver for waterproofing and roofing contractors.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Stages named after how your jobs move

    From the first photograph to the warranty visit, with the exit rule for each stage written in a line so two people place the same job in the same stage.

    Result: Anyone can read where a job stands.

  2. One record for each building, not each call

    The address, the building type, the roof or wet area, the system applied, the date and the warranty terms, with every later conversation attached to it.

    Result: A returning customer is recognised on the first ring.

  3. Fields for the people who decide

    The committee secretary and treasurer, the general body date, the builder's authorising engineer, the factory shutdown window, each held in its own field.

    Result: The next decision-maker and date are visible.

  4. Source and reason lost on every record

    Search, Maps, a painter's referral, a dealer, a past customer, and for lost quotations a one-line reason picked from a short list.

    Result: You learn which source fills the diary and why quotations fail.

  5. Reminders that reach a named person

    Quotation follow-ups, the meeting date, the pre-monsoon note to past customers and the anniversary of each warranty, each assigned to someone in the office.

    Result: A task with a name against it gets done.

  6. A tool chosen after the stages are drawn

    A well-built spreadsheet or a CRM such as Zoho CRM, whichever the office will open daily, with old jobs loaded from invoices and warranty files.

    Result: The system is used, not just bought.

  7. A view of inspections against jobs

    Enquiries, inspections, quotations and approved jobs by locality and by month, measured from the baseline recorded before work begins.

    Result: You see where in the chain the work is leaking away.

How the result is measured

  • Enquiries logged in the CRM
  • Data completeness
  • Reports generated from CRM data

Recorded as a baseline before work starts, so every later report has an honest comparison.

Fields worth keeping

The fields a waterproofing firm should hold on every site.

Site and surface type
Terrace, bathroom, basement, shed or tile roof, filled by the inspector. Lets you find every similar job when a pre-monsoon page needs photographs.
Inspection date and findings
Filled on the day by the supervisor. Keeps the cause of the leak with the building, so the quote and the later claim refer to the same finding.
System quoted and warranty stated
Filled by the estimator. Lets the office answer a warranty question years later without hunting through paper.
Decision-maker and committee date
Filled when the secretary tells you. Lets you follow the quote up before the meeting and not after it.
Quote status and reason for loss
Updated by whoever speaks to the client. Shows whether jobs are lost on price, timing or silence.
Completion date and monsoon check
Filled at handover. Gives the date of the first rain after the job, when a call or a visit tells you how the work held.

Who it is for

This is written for these waterproofing and roofing contractors.

  • Terrace and roof waterproofing contractors
  • Bathroom and wet area leakage specialists
  • Basement and podium waterproofing contractors
  • Approved applicators of waterproofing chemical brands
  • Metal roofing and pre-engineered shed roofing contractors
  • Polycarbonate, skylight and car park shed installers
  • Gutter and rainwater drainage installers
  • Mangalore tile and traditional roof repair specialists
  • Heat insulation and cool roof coating contractors

Before you decide

When this may not be the right fit.

  • Your supervisors will not open a system after a day on a roof, and a register nobody reads would hold the stale quotes
  • You handle few enough jobs that the owner's diary covers them, so a CRM would add work without adding memory
  • You have not yet decided stage names for an inspection, quote and handover, and fields built now would be renamed

Before you decide

Agree the work. Know how to judge it.

CRM for waterproofing and roofing contractors: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

List the records your team uses and show how an enquiry becomes an order today. Bring examples of duplicate entries, missing owners, and reports that require manual correction.

Make the scope clear

Agree the stages, required fields, access roles, and integrations before configuring the system. Separate software subscriptions from setup, data work, and training.

Check the work in use

Ask the people who will use the CRM to complete a real handover and find the next action without help. Check that the management report can be traced back to individual records.

Know when to change course

If the process is unclear, buying a more complex CRM adds more places for confusion. Start with the minimum fields and rules the team can use consistently.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from waterproofing and roofing contractors. Anything missing is noted in the written scope, with who will supply it.

Every open enquiry and quotation
Gather all current enquiries and quotations in any form: diaries, phone notes, WhatsApp chats, supervisors' memory. Write them on one sheet before we meet. Without a complete list, the system begins with gaps, and the missing jobs are the ones that go cold first.
A day with the office and a supervisor
We need a day when the person who runs the diary and one supervisor sit together. They explain how work really moves. If they cannot be released, the stages come from the owner's description, and the first complaint will be that the system does not match what happens.
A decision on who enters data
Supervisors are on site and cannot type at length. Decide whether the office enters their updates from a call, or the supervisors send a voice note. We build the tool around that choice. Without it, the system fills only when the owner remembers to chase.
A list of the tools already in use
Tell us which spreadsheets, accounting software, phone contacts and messaging apps you already depend on. We may reuse them. If something paid exists and nobody uses it, we say so before suggesting anything new.

How it works

How the CRM work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Draw how a job moves on a wall

    We sit with the owner and the office and draw each stage a job passes through, from the first call to the inspection, the quotation, the committee meeting, the work, the handover and the warranty check. You mark where jobs get stuck. What exists afterwards is a diagram of your jobs, which is not the same as a shop's sales stages.

  2. 2

    List the people on each building

    For a handful of live buildings we list everyone with a say: owner, secretary, treasurer, tenant, site engineer, plant head. We note what each wants. This tells us which fields the record needs, so that a building holds its people and its history in one place.

  3. 3

    Define the fields and the lost reasons

    We fix a short set of fields: source, building, decider, system quoted, next step and date. We add a short list of reasons a job is lost. You trim anything the office will not fill. A short form that is completed beats a long one that is skipped.

  4. 4

    Load live jobs and past buildings

    Open enquiries and quotations go in first, then past jobs, by building. The office does the loading with our help so they know where things sit. Old jobs missing consent for contact are marked and set aside. You approve the cleaned list before reminders switch on.

  5. 5

    Set the reminders and choose the tool

    Reminders are assigned to named people, with a rule for the wet weeks when the diary is crowded. Only after the stages are fixed do we choose the tool, starting from what the office already uses. We then compare inspections and jobs to the starting figures, and report the view of inspections against jobs.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales management. A target, a review routine and someone who owns the number.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3 · you are here

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Do we need paid software to start?
No. A shared spreadsheet with the right columns and a daily habit beats an unopened CRM. Draw the stages first, run them for a while, and move to software when the sheet can no longer hold the volume.
Who should enter the data when supervisors are on site?
Supervisors send photographs and a short voice note to one number, and a person in the office enters them. Asking a crew on a terrace to type into a form is how records stay empty.
Can old jobs be loaded in?
Yes. Invoices, warranty cards and site photographs hold the address, system and date. Start with jobs whose warranty is still running, since those are the customers you will be calling and the first to be checked.
Can the CRM hold warranty paperwork?
Hold the scan against the site record and the date it applies from, and keep the original safe. Warranty terms differ by system and by maker, so store the exact wording you issued. A claim years later is answered from the record, not from memory.
Can the CRM hold the warranty papers and inspection photographs?
Yes, as links or attachments on the building's record, provided the tool allows it and the files are named by building and date. Photographs are heavy, so we keep them in a shared folder and store the link on the record. The warranty paper is attached beside the job so the supervisor can open it on a warranty visit. We agree with you who may see it, and where the originals are kept.
How much does it cost?
There is no price list, because the work differs by business. The fee is scoped after we have read your brief and spoken to you, and put in writing before anything starts, split into our time, your media spend and production.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.
What do you need from us?
Your brief, and a conversation. After that, access to whatever this work touches, such as your website, your accounts or your enquiry record, and time with the people who handle your enquiries.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.