We depend on two or three big buyers
One drawing change or a vendor review at a single plant puts the shop at risk. We have never reached the smaller integrators.
Output to assess: India-specific fit checks
Review whether “India-specific fit checks” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
