Architects specify other systems
The big brand's window system appears in the drawings, and we hear about the job only when the fabricator asks for a cheaper copy.
Output to assess: Competitor and specification log
Review whether “Competitor and specification log” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
