Our product range is long and buyers cannot find the item
A contractor needs 3.5-core 240 sq mm XLPE cable. Our catalogue is a PDF of 80 pages that nobody opens.
Output to assess: Current selling material
Review whether “Current selling material” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring a completed opportunity record, its requirement and outcome, and the assumptions used to prioritise it.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
