RFQs sit unanswered while the buyer moves to the next vendor
A drawing arrives by email while the quoting engineer is on the shop floor. The reply goes out four days later, with no tooling lead time stated. By then the buyer has already sent a sample order to a competitor who replied within a day.
Output to assess: Approval route map
Review whether “Approval route map” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
