Consultants specify the same three brands every time
Nobody on their side has seen your drawings, test certificates or a reference list, so you are never in the first draft.
Output to assess: Stop-reviewing list
Review whether “Stop-reviewing list” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the relevant target or plan, the underlying records, and the decision rights of the people responsible.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
