Consultants specify the same three brands every time
Nobody on their side has seen your drawings, test certificates or a reference list, so you are never in the first draft.
Output to assess: Order handover sheet
Review whether “Order handover sheet” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
