Contractors think BIM is just a 3D drawing
They ask for a price per drawing, and our proposal for coordination, clash resolution and handover looks inflated beside it.
Confirm the scope first
Check whether this issue belongs in the sales organisation design engagement or requires different work. The industry problem alone does not establish that this service will solve it.
What to bring
Bring the relevant target or plan, the underlying records, and the decision rights of the people responsible.
Proposed completion check
Record the scope decision and its reason. If the issue is outside this engagement, identify the responsible team or the separate work required.
