Commercial architects · Website
Your website should show scale, role and constraint, not only renders.
A website for a commercial architect is the first place a commissioning buyer checks and the page a referrer sends. GullySales works on the structure, the project pages and the enquiry route, and leaves the visual identity to your designers.
Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

What website means
A website is the page a customer lands on after searching, clicking an advert or scanning a code, and it decides whether they call or leave. GullySales builds and maintains sites that load quickly, explain the offer plainly and make the enquiry form or phone number easy to find.
Last updated 14 Nov 2026.
For commercial architects
Where it usually goes wrong, and what we would do.
“A gallery does not answer the buyer”
A warehouse developer scrolls through renders and still cannot tell whether the practice has built one. Each project needs its type, built area, your scope, the constraint and the consultants named.
“Slow, heavy pages lose the visit”
Large image files make a site crawl on a phone in a car. A buyer who gives up never sees the work, so images need preparing for the web without losing quality.
“The contact route is an afterthought”
A form that asks only for name and message gives the partners nothing to act on. A short brief form asking for building type, site and stage lets a partner reply with something useful.
What we do
What we deliver for commercial architects.
The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.
Site structure
A clear layout with pages for each building type, the team, approvals experience and contact.
Result: A buyer finds their building type in one click.
Project page template
A repeatable page format giving the brief, scale, scope, constraint, approvals and result, with client names only where allowed.
Result: Every project is presented in the same useful way.
Team pages
Profiles of the partners and project leads that state responsibilities and building types handled.
Result: A buyer sees who would work on the job.
Brief form and routing
An enquiry form that collects building type, site and stage and sends it to a named partner and the pursuit record.
Result: Enquiries arrive ready to act on.
Speed and mobile review
Image preparation and a check of how the site displays on phones.
Result: The site loads and reads well on a handset.
How the result is measured
- Page load time
- Bounce rate
- Enquiries from the website
Recorded as a baseline before work starts, so every later report has an honest comparison.
Searches your buyers type
Show scale, role and constraint in words so a shortlist reader can decide.
- [practice name] office projects
- A page for each building type, with projects described by area, role, client type and constraint. Place the words next to the images, so a search reads them.
- who leads the design team
- Team pages naming the partners and their projects. A projects head wants to know who will attend meetings and who will draw.
- how to brief an architect
- A page for first-time clients on what to prepare and what happens next. It answers a search that a gallery site misses.
- architect for a hospital or campus project
- A building-type page that names built work and the planning problems in plain terms. State your role exactly where other consultants were involved.
- send a brief to the practice
- A short form asking for the building type, area, location and the client's role, routed to a partner. Offer a phone number too.
Who it is for
This is written for these commercial architects.
- Office and business park architects
- Retail, mall and showroom design practices
- Hospital and healthcare building architects
- Industrial, warehouse and logistics park architects
- Mixed-use and township planning practices
- Hotel and hospitality building architects
- Educational campus architects
- Practices that work only for corporate occupiers
Before you decide
When this may not be the right fit.
- The partners cannot supply descriptions of projects, so the pages would be images only
- Your projects are under confidentiality and nothing may be shown, so the site would have little to prove
- The site cannot be edited by the practice, and updates would wait for a developer
Before you decide
Agree the work. Know how to judge it.
Website for commercial architects: use these checks to prepare, choose the scope, and review what changes.
Bring the right evidence
List the pages that support a buying decision and the actions visitors must complete. Keep examples of failed forms, unclear product information, and questions your team answers repeatedly.
Make the scope clear
Agree the page list, content ownership, integrations, and who controls the domain and hosting. Include redirects and existing search traffic in a redesign brief, before changing addresses.
Check the work in use
Complete a real enquiry journey on a phone and a laptop. Check that the confirmation appears, the enquiry reaches the right person, and tracking records the action once.
Know when to change course
If visitors can enquire but the team does not follow up, start with the sales handover. A larger website will not resolve that delay.
These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.
Before we start
What to have ready before the work starts.
The records, access and decisions this work needs from commercial architects. Anything missing is noted in the written scope, with who will supply it.
- Fact sheets and clearances for selected projects
- For each project, a short sheet of area, year, role and problem, plus the client's clearance. Without them, we write nothing about the project. A missing sheet means the project is left out. Where the practice has two logos, the one to use on the site is chosen before design begins.
- Original images of the finished buildings
- Full-size photographs and renders with credit. Small copies from the old site look poor. If originals are not at hand, we list which to request. Where a partner dislikes their photograph, a new one is taken before the team pages are written.
- Domain and hosting logins
- The registrar and hosting accounts, in the practice's name. We need them to launch and to hand over. If a former vendor holds them, the transfer is requested before the build. Where the practice has an address change pending, the date is noted so the contact page is correct on launch.
- Short biographies and photographs of the partners
- A few lines on each partner's work and a current portrait. Buyers read the team pages. Missing biographies leave blank pages that we do not publish. Where the brief form needs a file upload, the practice says what size of file its mailbox accepts.
- A named recipient for new briefs
- A person who reads the form and replies. The contact route is the part practices neglect of a practice's site. If no one is named, a partner takes it until someone is hired. Where the site must meet a client's security review, the partner shares the checklist before the build starts.
How it works
How the website work runs
The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.
- 1
Open today's site beside a partner
We sit with a partner and use the existing site as a buyer would, from a phone and a laptop, noting where it confuses and where it loads slowly. You say which pages you like. What exists afterwards is a list of what to keep, change or drop, and the visit and enquiry counts the site records today.
- 2
Choose the projects that tell the story
With the partners we pick the finished buildings that answer the commissioning buyer's questions, and check each has a fact sheet and client clearance. A gallery of everything is replaced by a few projects explained properly. The partners decide the order, so the projects they want to win work for come first.
- 3
Sketch the site around the buyer's questions
We draw the structure so that a visitor can find building types, projects, the team, the way the practice works and a route to send a brief. The partners approve the sketch before design. What exists afterwards is a map in plain words. The sketch also marks which old pages are retired and where each address will point.
- 4
Write the project pages from the fact sheets
We write each project page from the partner's fact sheet and our interview, covering the brief, constraints, approach and result. The project architect checks the figures. Client names appear only with clearance. Where a project cannot be shown in full, the page says what the practice did and leaves the rest to a meeting, so the buyer is not given a wall of unexplained pictures.
- 5
Build the brief form with a named reader
We create a short form for a new brief, ask the minimum, tag the source and route it to one person. A dummy brief is sent and followed through. You approve the launch only after the dummy arrives with the partner's reply routine. The form asks for building type, place and who is writing, and a file upload only if the mailbox can accept it.
- 6
Check the live site against old counts
After launch we test speed and mobile display on real phones, then compare visits, briefs and the time spent on project pages with the counts recorded from the old site. The partners and we decide what to adjust. Nothing is promised, and the passwords pass to the person you name.
Where this fits
Three pieces of sales work, in this order.
This work sits inside sales process design, at stage 1, prospecting and lead generation. The audit comes before it, and sales management keeps it running.
Step 1
Sales audit
Find where deals are being lost and what to fix first.
Start here if you cannot say where orders are lost.
Step 2 · you are here
Sales process design
One written way to sell, from first enquiry to repeat order.
Start here if every salesperson sells differently.
Step 3
Sales management
A target, a review routine and someone who owns the number.
Start here if the team has targets and no routine.
FAQ
Questions owners ask before they call.
Not here? More answers, or ask on WhatsApp.
Do we need to rebuild the site?
Should the site show client names?
Do we need to rebuild the site?
Should the site show client names?
Should the site list our client names?
Do we need to rebuild the whole site or can we improve what exists?
How much does it cost?
How long is the contract?
How soon will we see results?
Who will actually do the work?
More for commercial architects
Related work to consider.
Closest to this: search and visibility
Also for commercial architects
Or start from the overview: sales and marketing for commercial architects.
Your next practical step
Tell us what you are trying to grow, and we will read it before we call.
Eight short steps, mostly taps. Skip anything you would rather answer on the call.