Decision-makers change during the project
The managing director replaces the layout after the admin head signed off, and the design agreement does not say how changes are handled.
Output to assess: Design direction sheet
Review whether “Design direction sheet” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the accepted commitment and the later service or contact record, with permission to use the example for review.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
