Skip to content
GullySales

Solar maintenance companies · CRM

Keep one record per roof, so the fault, the visit and the renewal sit together.

A CRM for a solar maintenance company is the record of every roof you look after, with its system, faults, visits and contract dates, kept where the desk and the engineer can both read it. GullySales sets up the fields, stages and reminders around how your visits really run, and trains the team to fill them.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Solar technicians inspect rooftop panels with a thermal camera

What CRM means

A CRM is the record where every enquiry, call and quote is kept against a customer, replacing separate notebooks, spreadsheets and memory. GullySales sets up or cleans an existing CRM and reports from it by enquiry outcome rather than by activity logged.

Last updated 14 Nov 2026.

For solar maintenance companies

Where it usually goes wrong, and what we would do.

  • “The customer is a phone number, not a roof”

    Two calls from one owner on different numbers create two customers, and the engineer arrives not knowing about the earlier fault.

  • “Engineers fill the sheet at night, or not at all”

    A paper job sheet is carried on the roof and typed up later or lost. The record is a day late and missing the readings.

  • “Serial numbers live in photos on a phone”

    The inverter's serial plate and the install year sit in an engineer's gallery. A warranty claim a year later starts with a search through someone's pictures.

What we do

What we deliver for solar maintenance companies.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. One record per roof

    Address, system size, inverter make and serial number, panel make, install year and the original installer, all on one record.

    Result: The desk and the engineer read the same page.

  2. Stages for a fault and for a contract

    Enquiry, visit booked, visit done, quote sent, contract signed, renewal due and lapsed, named the way your team says them.

    Result: Every roof is at a known stage.

  3. Entry from the roof

    A short phone form the engineer fills at the end of the visit: findings, readings, photos and whether parts are needed.

    Result: The record is complete before the engineer leaves the site.

  4. Reminders for renewals and seasons

    Reminders built from the contract dates, and a seasonal list for the cleaning round.

    Result: Renewals do not rely on memory.

  5. Import of the old sheets

    Existing job sheets and chat records cleaned into the new record without losing the visit history.

    Result: You start with your history, not an empty system.

  6. A one-page view for the owner

    Open faults, quotes waiting and renewals due, on one screen.

    Result: You see where the business is losing roofs.

How the result is measured

  • Enquiries logged in the CRM
  • Data completeness
  • Reports generated from CRM data

Recorded as a baseline before work starts, so every later report has an honest comparison.

What to record, and when

What to write down for each roof, who writes it, and what it lets you do later.

System details at first contact
Record inverter make, system size, install year and the original installer. The first call gives the make and the size, and the visit gives the serial number.
Faults and what was found
Write the symptom in the owner's words and the cause in the engineer's. Over a season this shows which fault comes up most and which make it belongs to.
Readings at every visit
Record the generation and any fault code on arrival and before leaving. Without them, an owner's claim that cleaning changed nothing cannot be answered.
Photographs on the record
Keep the display, the serial plate, the roof and any damage with the visit, not on the engineer's phone. When the engineer leaves, the photos stay.
Quote, contract and renewal dates
Put each quote date, the amount quoted, the contract start and the renewal date on the roof's record. Renewal reminders come from these dates.
Do you need software yet?
If one person handles all the roofs and a sheet holds one row per roof, not yet. When two people take calls, or renewal dates are being missed, move to a CRM.

Who it is for

This is written for these solar maintenance companies.

  • Residential rooftop AMC and panel cleaning services
  • Housing society and apartment common-area solar maintenance
  • Commercial and industrial rooftop O&M contractors
  • Waterless and robotic panel cleaning specialists
  • Inverter and battery repair and replacement specialists
  • Solar pump and solar water heater service dealers
  • Third-party O&M for EPC-built and ground-mounted plants
  • Performance audit and thermography inspection firms

Before you decide

When this may not be the right fit.

  • Your engineers will not update anything, and a record they leave blank would give a false picture of every roof
  • You manage a small number of roofs that the owner knows personally, where a spreadsheet already does the work
  • Customer details sit only in personal chats and no one will move them, so the record would start empty

Before you decide

Agree the work. Know how to judge it.

CRM for solar maintenance companies: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

List the records your team uses and show how an enquiry becomes an order today. Bring examples of duplicate entries, missing owners, and reports that require manual correction.

Make the scope clear

Agree the stages, required fields, access roles, and integrations before configuring the system. Separate software subscriptions from setup, data work, and training.

Check the work in use

Ask the people who will use the CRM to complete a real handover and find the next action without help. Check that the management report can be traced back to individual records.

Know when to change course

If the process is unclear, buying a more complex CRM adds more places for confusion. Start with the minimum fields and rules the team can use consistently.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from solar maintenance companies. Anything missing is noted in the written scope, with who will supply it.

Every sheet and notebook with customers
Bring all of them, even those you think are out of date. We cross-check to find the roofs that only exist in one place. Missing sources become customers the new record never learns about.
Phone photographs of serial numbers
Engineers keep pictures of inverter and panel labels. Ask them to share the albums or forward the images. We link them to records. Without them, the serial field starts empty and a later warranty question has no answer.
One engineer to test the entry
Choose an engineer who will try the record on a roof and tell us honestly what is slow. Their word shapes the fields. If every engineer is too busy, the design is guessed at the desk and may be dropped.
A decision on who keeps the record
Name the person who corrects entries and chases gaps. Software does not clean itself. Without a keeper, the record decays within a season and reverts to a sheet.
Your dates for cleaning rounds
Tell us the times of year you run cleaning rounds and any society that books a fixed round. Reminders are built from these. Without them, reminders are set on contract dates alone and the seasons are missed.

How it works

How the CRM work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Gather every place a customer is written

    We ask for your sheets, notebooks, WhatsApp chats and the photographs engineers keep of serial numbers. You point to the file you trust best. We list what each holds and where it conflicts, so the import is planned around real sources and not a single clean spreadsheet that does not exist.

  2. 2

    Design a record around the roof

    With your desk and one engineer we decide the fields on a roof's record: owner, society, system make, inverter serial, panel count, visit history and contract date. A phone number is only one field among them. You cut any field nobody will fill, so the record stays light.

  3. 3

    Draw the stages for a fault and a contract

    We write two short paths: a fault from call to closed repair, and a contract from enquiry to renewal. You tell us where your work really changes hands. Each stage has a name in your own words and a person responsible.

  4. 4

    Test entry from the roof on a phone

    An engineer enters a visit while standing at the inverter, using only a phone and a poor signal. We watch where it slows or fails, and cut fields until entry takes less effort than the night-time sheet. Photographs attach to the record instead of staying in the gallery.

  5. 5

    Import the old sheets and set reminders

    We bring the cleaned sheets into the record and set reminders for contract renewals and for the cleaning seasons you name. You check a sample of roofs against the originals. Then we compare renewals followed up, and fault calls closed, with the numbers noted before the system began.

  6. 6

    Give the owner a one-page view

    We build a page that shows the owner open faults, contracts due and quotes waiting, without opening a record. You decide the few figures it shows. The first review sits with your owner and desk, who tell us what is missing.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales management. A target, a review routine and someone who owns the number.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3 · you are here

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Can we manage with a spreadsheet?
Yes, for a small number of roofs, with one row per roof and one person who keeps it. It breaks when two people edit it, when photos must sit with the record, or when renewals depend on reminders. Count the times that has happened to you and you will know which side you are on.
Our engineers will not update anything. What then?
Cut what they must enter to what only they know: findings, readings, a photo and whether parts are needed. The desk fills the rest from their message. A long form on a roof is a form nobody fills.
Our customer details sit in WhatsApp chats. Do we lose them?
No, but they must be copied into the roof record, because chat search will not find a serial number from last year. Start with the roofs whose contracts come up for renewal and add the others as they call.
Who owns the customer data in the CRM?
You do, and your agreement with any software firm should say so and say how you export it. Owners' phone numbers and addresses are personal data, so keep access to those who need it and check your obligations with your adviser.
Can the desk see which engineer last visited a roof?
Yes. Each visit is saved against the roof with the engineer's name, the date and the photographs, so the desk sees who last visited and what was found before it assigns the next visit. This also helps when an owner asks for the same engineer. We show the last visit at the top of the record and agree with your team who may edit past entries.
What happens to the record when an engineer leaves?
Their entries stay on the roofs they visited, and their access ends the same day. Work they had pending is reassigned from a list the desk can see. Without a shared record, an engineer who leaves takes the roof history on a phone. We set the access rules with you and note who removes a login, so the record stays with the firm.
How much does it cost?
There is no price list, because the work differs by business. The fee is scoped after we have read your brief and spoken to you, and put in writing before anything starts, split into our time, your media spend and production.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.