Architects specify a big system brand and we only get the leftover work
The practice down the road writes a premium brand into every drawing because nobody from our company has ever shown them our installed projects.
Output to assess: Completeness checklist
Review whether “Completeness checklist” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
