Projects drag because the client never sends content
The design is approved, the build is ready, and we wait weeks for product photos, text and the logo in the right format.
Output to assess: Handover pack for layout
Review whether “Handover pack for layout” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring an anonymised conversation or current selling document, with the task the person was expected to complete.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
