A quotation format buyers can compare in two minutes

The fields, the order and the assumptions line that let a buyer set your quotation beside two others and decide, so they stop phoning with the same five questions.

The GullySales team · Updated 17 Oct 2026 · 6 min read

Editorial illustration for Quotation and proposal follow-up
On this page
  1. How does a buyer read three quotes laid side by side?
  2. What does the sheet look like?
  3. Why does the assumptions line matter more than the rate?
  4. For example: a ceiling contractor in Solapur
  5. What happens when you must revise it?
  6. How should you handle options?
  7. When is a fixed format the wrong tool?
  8. Rebuild your best quotation

A buyer compares quotations in two minutes when the same five things sit in the same place on every sheet: what is supplied, the total, what the total leaves out, how long the price holds, and who does what next. Put the total and the assumptions on the first screen, not on page three. When buyers phone to ask "is GST included?", the answer was probably in your quotation, just not where they looked.

How does a buyer read three quotes laid side by side?

Rarely from the top down. They hunt for the total, then for what it leaves out, then for a reason to trust one over the others. A committee does this with three printouts on a table, often while someone else is talking.

So the layout has two jobs. It must put the same fields where the eye expects them, and it must give the committee something to defend when yours is not the lowest.

What does the sheet look like?

Here is a sample, with illustrative figures and dates in brackets for you to fill. Keep the order fixed from one quotation to the next.

QUOTATION No. Q-0147    Date: [date]    Valid until: [date]
To: [Buyer]             From: [Your firm], GSTIN ____

Summary: False ceiling and 6 partitions, classrooms 1 to 6, supply and fitting

Item              Spec                    Qty    Unit   Rate   Amount
Gypsum ceiling    12.5 mm board, GI grid  2,400  sq ft  95     2,28,000
Glass partition   10 mm toughened, frame  6      nos    18,500 1,11,000

Total (excl. GST): 3,39,000    GST 18%: 61,020    Total: 4,00,020 (in words)

Assumes: rooms are cleared and power is available; start date
[agreed with the buyer]; drawings as on the [date] visit.
Not included: electrical rewiring, painting after fitting, debris removal.
Payment: 40% on confirmation, balance on handover.
Next step: reply "confirmed" before the validity date and we fix the start date.

The summary line is the most neglected part. A reader who never met you learns from it what the paper is about, and it is the line that gets quoted when somebody forwards the sheet.

Why does the assumptions line matter more than the rate?

Because it holds every unspoken condition behind the price. Without it, each condition becomes a question on the phone, or an argument after the work.

Write the assumptions as plain statements the buyer can tick or correct. Then read the quote as the buyer's accountant would and mark every place they would ask "does this include...?". The answer goes there.

The exclusions line is the same idea turned round. "Debris removal not included" costs you five words and may save a quarrel about a skip, a labourer and a day.

For example: a ceiling contractor in Solapur

Imagine a contractor in Solapur who quotes a coaching institute for ceilings and six glass partitions. The note is one line on a letterhead: "Ceiling and partition work, ₹3.4 lakh (an illustrative figure), GST extra." A second contractor sends the sheet above. The institute's trustees spread the two on the table. One says a total, "GST extra" and nothing else. The other shows the area, the board thickness, the exclusions and a validity date.

The trustees do not go for the lower number on principle. They phone the first contractor to ask whether painting is included. The answer is no; they add painting in their heads, and the gap closes. That took a day, and the second quote was already on the agenda for the trust meeting.

The contractor does not need to lower the price. The contractor rewrites the same facts in the sheet's order, adds "painting after fitting not included" and sends it again. The snag is that the first sheet cost the contractor the meeting slot: the trustees will only look at the revised sheet at the next one, a fortnight on (an invented delay). The total is now comparable, but the contractor came second to the room's attention.

What happens when you must revise it?

A room is added or a date moves. Resist overwriting the old sheet. Keep the number and add a revision mark, "Q-0147 rev 2", and put one line at the top that says what changed: "Rev 2: partitions reduced from 6 to 4; ceiling unchanged." The committee that saw version one can then spot the difference in ten seconds, and nobody can later claim they were quoted something else. Mark the old sheet "superseded" in your file so the two are never confused on a busy day.

How should you handle options?

Offer two, labelled by what the buyer gets rather than what you pay: "Option A: painted board, standard grid. Option B: moisture-resistant board, concealed grid." Show a total for each and one line on what changes. Put your recommendation first, with a reason in a sentence.

Three options split a committee, and five make a catalogue. Anything the buyer did not ask for, such as lighting or lockers, belongs on a separate page.

When is a fixed format the wrong tool?

When the price cannot be known until someone visits: a renovation, a machine built to drawing, an installation on a site you have not seen. Send a range instead, with the assumptions, and say plainly that the final figure follows the visit. A precise number that later moves costs you more trust than an honest range.

Skip the full sheet, too, for a regular customer who orders the same item. A short confirmation with rates and the usual terms will do, provided the terms really have not changed.

Rebuild your best quotation

Take your last three quotations and tick the five places: what is supplied, the total, what the total leaves out, how long the price holds, and the next step. The one with most ticks becomes your template, fields locked and content blank. If you want one built for your trade and checked against how your buyers compare, proposal development covers it, and where it sits is mapped on the sales process page. You can also tell us what you need.

Questions

Questions owners ask.

Should the quotation be a PDF or a message?
Send a PDF for anything a second person must read, and a two-line message with the total for a quick price check. A PDF is easy to forward and keeps your layout. A long WhatsApp text gets lost under newer chats.
How long should a quotation be?
One page for most small orders. If it runs to a second page, the first page must still hold the total, the validity and the assumptions, so a reader who stops there has the whole picture.
Do I show my discount as a separate line?
If you give one, show it, with the list price above it. A buyer comparing three quotes will think a bare low figure hides something. Showing the discount also stops a later request to take it off again.

From the blog

More notes for owners.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.