Architects do not specify our plant by name
AAC is written into drawings as a generic material, and the builder buys from whoever quoted last.
Output to assess: Requirements read-through
Review whether “Requirements read-through” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring an anonymised conversation or current selling document, with the task the person was expected to complete.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
