Quotations go out and then go silent
A cold room quotation takes a day of drawing and costing, and after that nobody calls the buyer again, so the buyer buys from whoever did.
Output to assess: Technical qualification sheet
Review whether “Technical qualification sheet” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring a completed opportunity record, its requirement and outcome, and the assumptions used to prioritise it.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
