Corporate tenders are quoted without a proposal to back them
An office furniture enquiry gets a price list with no reference project or sample piece, and the tender goes to a manufacturer who sent both.
Output to assess: Second-line map
Review whether “Second-line map” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring an anonymised conversation or current selling document, with the task the person was expected to complete.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
