A site visit and layout take days and some go nowhere
The engineer travels, measures and draws, and the buyer then uses the drawing to get a cheaper quote elsewhere.
Output to assess: Evidence map
Review whether “Evidence map” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring an anonymised conversation or current selling document, with the task the person was expected to complete.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
