Skip to content
GullySales

PCB assembly companies · Lead generation

Bring in BOMs that arrive complete, from buyers who intend to build.

Lead generation for a PCB assembly company is the work of putting your line in front of hardware founders, design engineers and purchase heads at the moment they have a board to build. GullySales works on where those buyers look, what they are asked to send, and how each BOM reaches your estimator.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Realistic editorial illustration of electrical equipment manufacturers at work in India

What lead generation means

Lead generation is the combined work of every channel that brings in a new enquiry, whether from search, adverts, referrals or a stall at an exhibition. GullySales runs these channels together and reports the number of enquiries each one produced, not the activity behind it.

Plan the next part of the work

Last updated 21 Nov 2026.

For PCB assembly companies

Where it usually goes wrong, and what we would do.

  • “The buyer sends one message to several shops”

    A founder with a finished layout attaches the zip file and writes to every assembler found on a search page. The shop that replies first with a clear question about a missing footprint is treated as the serious one. Lead generation here is as much about reply habits as about reach.

  • “A lead without a pick-and-place file is half a lead”

    IndiaMART and the website form both bring enquiries that carry a BOM and nothing else. The estimator then spends the afternoon chasing placement data. A form that asks for the right files turns a vague contact into a quotable one.

  • “Prototype buyers and OEM buyers use different doors”

    A startup engineer searches for a shop that builds a small lot. An OEM sourcing head is reached through a capability pack, a referral from a design house or a plant visit. One channel for both wastes effort on each.

  • “Design houses and PCB fabricators already know your buyers”

    The people who lay out boards and fabricate bare PCBs meet the founder before the assembler does. A working relationship with them sends buyers to you with files ready. Few assembly shops build that route on purpose.

What we do

What we deliver for PCB assembly companies.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Source map by buyer type

    A written list of where startup founders, design engineers and OEM purchase teams look for an assembler, with the route chosen for each.

    Result: You can name the doors you are working on and the buyer behind each.

  2. Enquiry form that asks for the right files

    BOM, Gerbers, pick-and-place data, quantity and target date, with a clear note on what an incomplete pack delays.

    Result: An enquiry arrives with its files or with a named gap.

  3. Design house and fabricator outreach

    A short introduction pack for layout studios and bare board fabricators, with the lot sizes and board types you take.

    Result: You hold a list of partners with the date of each conversation.

  4. IndiaMART sort

    A rule that separates complete BOM requests from bare price asks so the estimator opens the complete ones first.

    Result: Complete requests are visible at the top of the queue.

  5. Source tag on every enquiry

    Each BOM logged with the channel it came from, so you see which door produces quotes and orders.

    Result: The tracker shows the channel for every quote and every order.

How the result is measured

  • Relevant enquiries by source
  • Duplicate and unsuitable enquiries
  • Time to the first response
  • Accepted enquiries reaching an agreed next step

Recorded as a baseline before work starts, so every later report has an honest comparison.

What to capture or send

Capture the files and facts that make a BOM quotable.

An incomplete pack costs days of chasing. The form and first reply should ask for these before an estimator opens the file.

BOM with manufacturer part numbers
Uploaded by the buyer. The estimator prices parts from it, so lines with only a value and no part number come back with a request.
Gerber and pick-and-place files
Uploaded by the buyer's design engineer. Without centroid data and polarity marks the line cannot be programmed or quoted.
Turnkey or consigned
Chosen on the form. It decides whether the shop prices and buys parts or receives them from the customer.
Lot size and expected reorder
Stated by the buyer: prototype, pilot or production. It sends the enquiry to the right estimator and tells you whether this is a first lot or a pattern.
Acceptable alternates
Marked by the buyer on the BOM. It lets the shop offer a substitute when a part is short, instead of stopping the quote.
Source of the enquiry
Tagged by whoever logs it: design house, fabricator, marketplace, search or referral. Shows which door brings boards that get built.

Who it is for

This is written for these PCB assembly companies.

  • Prototype and low-volume SMT assembly shops for startups
  • Turnkey assemblers who source components for OEMs
  • Consigned-parts assembly for brands that buy their own components
  • High-mix, low-volume lines for industrial and medical electronics
  • Automotive and EV electronics assemblers
  • Box-build and final assembly providers with enclosure and harness work
  • Contract manufacturers for consumer and IoT products
  • Rework and repair houses for expensive boards

Before you decide

When this may not be the right fit.

  • The estimator is the only person who prices parts and is already behind, so more BOMs would lengthen the wait that loses buyers now.
  • Your line does not take small lots, but you plan to advertise to startups and would turn away most of the enquiries.
  • You have no one to filter marketplace enquiries, and real BOMs would be buried under students asking for a single board.

Before you decide

Agree the work. Know how to judge it.

Lead generation for PCB assembly companies: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

Define the organisations or buyers you can serve and the reasons they would consider a conversation. Bring examples of accepted and rejected prospects so the selection rule is visible.

Make the scope clear

Agree the research sources, contact approach, qualification rules, and handover. Clarify which meetings count as accepted and what happens to replies that are not ready to buy.

Check the work in use

Review why a prospect was selected and what was learned from the response. Count held, relevant conversations separately from contacts found, messages sent, or meetings booked.

Know when to change course

If the same objection appears repeatedly, adjust the offer or buyer group before increasing outreach. Respect a request to stop contact and keep the exclusion in the record.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from PCB assembly companies. Anything missing is noted in the written scope, with who will supply it.

A written list of boards you decline
The enquiry sort needs your honest limits: package sizes, layer counts, volumes, testing you cannot do. A paragraph from the plant head is acceptable. When it is missing, every enquiry reaches the estimator and the sort has no rule to apply.
Last year's enquiries from every inbox
We need the marketplace export, the email subjects and the call notes in whatever form they exist. They show which doors brought which buyers. Without them, the source map starts from today and has no past to compare with.
Three recent orders with their files
Real BOM and Gerber packs for won jobs show us what a good lead looked like. Customer names may be hidden. If none are shared, the form fields are written from general practice and may ask for the wrong things.
A named estimator for first replies
Someone must open every new pack and answer the sender. Tell us who covers when they are on the floor. Without a name, files sit unread and the test enquiry exposes the gap.
Your view on startups versus OEMs
Only you can say which buyer you want more of this year. A sentence is enough. If that is undecided, outreach is split evenly and neither door gets enough attention to be judged.

How it works

How the lead generation work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Decide which boards your lines can take

    We sit with your plant head and list the board sizes, component packages, volumes and test steps your lines handle well today, and those you would refer elsewhere. You decide what to turn away. What exists is a short written line between work you want and work that wastes the estimator's day.

  2. 2

    Sort the last enquiries by where they began

    We lay out the past enquiries from the inbox, IndiaMART, calls and visits, and mark each by door: prototype founder, OEM purchase team, design house, PCB fabricator. You tell us which became orders. Starting counts of enquiries, quotes and orders are written down before anything changes.

  3. 3

    Build the enquiry form around the files

    A lead without a pick-and-place file is half a lead. We draft the form to ask for the BOM, the Gerber pack, the centroid file, the quantity and whether parts are consigned or turnkey. Your estimator tells us which fields are truly needed and which only put buyers off.

  4. 4

    Approach the design houses and fabricators

    Design houses and PCB fabricators already know your buyers. We list the ones near you with your sales head and write a short introduction describing the boards you build and the files you need. You choose who is approached and who calls them.

  5. 5

    Send a test BOM through every door

    We submit a prototype request, an OEM-style request and a marketplace reply ourselves and watch who receives each, how the files are stored and whether the source is tagged. Missing links in the handoff to the estimator are mended before real buyers arrive.

  6. 6

    Read the sources against orders placed

    After launch we compare enquiries by source with the starting counts, then follow each to quote and order. You decide which doors get your estimator's time, which are dropped, and whether the marketplace sort is catching the right requests.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 1, prospecting and lead generation. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Should we chase OEMs or startups first?
Look at the line. If you carry small lots and quick changeovers comfortably, startups fill it and talk about you. If your strength is a quality system and sourcing depth, OEM teams are the better fit. GullySales sets the plan against the line you run.
Is cold outreach to purchase heads worth the effort?
It works when the message names a board type the recipient builds and offers a capability pack, not a general introduction. Check each platform's current rules on messaging. Treat every reply as a record in the tracker, including the refusals.
How do we know which source produces real orders?
Tag every BOM with its source when it arrives and note the outcome when the quote closes. After a few lots the tracker shows which door brings orders and which only brings requests for a price.
Should an assembly shop chase OEMs or startups first?
Start with the buyers your line suits best today. Startups bring small lots and may grow into larger ones, while OEMs bring pattern orders and slower approvals. Your line's minimum lot and your estimator's time decide, and the source tag will show which group brings built boards.
What should we do with enquiries that arrive without any files?
Reply once with a plain list of what is needed: the BOM, the Gerber pack, the centroid file and the quantity. Do not quote from a description. Record the enquiry as incomplete in your register, so you can see how many senders return with files and from which door. Some founders do not know what a pick-and-place file is, so link a short guide from your site and offer a call. If the sender does not return, close the enquiry with a reason.
How much does it cost?
There is no price list, because the work differs by business. The fee is scoped after we have read your brief and spoken to you, and put in writing before anything starts, split into our time, your media spend and production.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.
What do you need from us?
Your brief, and a conversation. After that, access to whatever this work touches, such as your website, your accounts or your enquiry record, and time with the people who handle your enquiries.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.