Our capability document states a tonnage range we no longer run
A 250-tonne press was sold months ago, but the PDF sent with every RFQ still lists it. A buyer who spots the gap on a site visit starts doubting the rest of the quote.
Output to assess: Proposed compensation structure
Review whether “Proposed compensation structure” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the relevant target or plan, the underlying records, and the decision rights of the people responsible.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
