RFQs are answered slowly or incompletely
A request for quotation with a technical drawing sits for days before a response, and the buyer has already moved to a supplier who replied within hours.
Output to assess: Specification table copy
Review whether “Specification table copy” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring an anonymised conversation or current selling document, with the task the person was expected to complete.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
