We quote a rate before we know the site
A figure said on the first call is held against us when the ground turns out to be rock or the lane too narrow. A quote written after seeing the site is much easier to stand behind.
Output to assess: Specification sign-off record
Review whether “Specification sign-off record” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring a completed opportunity record, its requirement and outcome, and the assumptions used to prioritise it.
Proposed completion check
Inspect a sample record against the original information. Check required fields, duplicate handling, the responsible owner, and who is permitted to access it.
