The site engineer rejected us on a detail we could have answered
Panel thickness, the gauge of the frame, an insulation or fire figure. It was all in our drawing, and nowhere in the quotation or on the website.
Confirm the scope first
Check whether this issue belongs in the customer education and knowledge base development engagement or requires different work. The industry problem alone does not establish that this service will solve it.
What to bring
Bring the accepted commitment and the later service or contact record, with permission to use the example for review.
Proposed completion check
Record the scope decision and its reason. If the issue is outside this engagement, identify the responsible team or the separate work required.
