The site engineer rejected us on a detail we could have answered
Panel thickness, the gauge of the frame, an insulation or fire figure. It was all in our drawing, and nowhere in the quotation or on the website.
Output to assess: Technical qualification sheet
Review whether “Technical qualification sheet” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring a completed opportunity record, its requirement and outcome, and the assumptions used to prioritise it.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
