Skip to content
GullySales

Office park developers · Follow up systems

Make sure a quiet occupier after the tour has a named person and a next date.

A follow-up system for an office park is the set of rules that says who contacts a company next, when and with what, after each stage of a lease. GullySales writes those rules and sets reminders to carry them out.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Realistic editorial illustration of real estate developers and brokers at work in India

What follow up systems means

A follow-up system is the set routine for calling, messaging or emailing an enquiry more than once, since most buyers do not decide on the first conversation. GullySales sets the number and timing of follow-ups so an undecided buyer keeps hearing from you until they decide either way.

Last updated 14 Nov 2026.

For office park developers

Where it usually goes wrong, and what we would do.

  • “Silence after a tour means the decision is moving elsewhere”

    The company has taken the long list to its legal team and its parent. If your campus sends nothing, the other campuses fill the gap. A short note answering the questions asked on the tour keeps you in the discussion.

  • “Each stage has a different follow-up”

    After a call, send the pack. After a tour, send the answers to what was asked. After a test fit, ask for comments on the plan. A single reminder to chase everyone sounds the same at each step and helps none.

  • “The leasing head cannot hold every thread”

    When the lead on a large requirement is travelling, the small-floor enquiries wait. A rule that gives each record a second owner means someone else picks up the note.

What we do

What we deliver for office park developers.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Follow-up steps for each stage

    What goes out after the call, the tour, the test fit and the term sheet, written once so every person on the team uses it.

    Result: Every stage has a written next step.

  2. A named owner and a second owner

    Each requirement has a lead and a back-up, shown on the record.

    Result: A record never waits for one person's return.

  3. Reminders linked to dates the occupier gave

    If a company said the board meets on a date, the reminder follows that date, not a generic timer.

    Result: Follow-ups match what the occupier said.

  4. Answers to tour questions sent in writing

    A note listing every question asked on the tour with the answer and any document attached.

    Result: The occupier's legal team has the answers in one note.

  5. A review of stalled requirements

    A list of requirements with no activity, reviewed by the leasing head with the reason for each.

    Result: No requirement goes silent without someone deciding what to do.

How the result is measured

  • Follow-up completion rate
  • Average number of follow-ups before close
  • Enquiries closed after repeat follow-up

Recorded as a baseline before work starts, so every later report has an honest comparison.

What to capture or send

The moments in a lease where a message keeps the requirement alive.

Tour completed
Send a note the same day with what was seen, the floor options and the next step proposed. Record the date promised for the reply.
Test fit delivered
Ask the real estate head what the occupier will review and when. Note the date, and follow up on it with the layout summary.
Consultant goes quiet
Send a short update on what changed on the campus, such as a freed floor or an approved phase. Give a reason to forward the note.
Term sheet in review
Ask who is reviewing and which points they will raise. Prepare answers before the call, so the next contact is a reply, not a reminder.
Occupier chooses another campus
Thank them, ask what decided it and record the reason. Note the date of the lease end and plan a contact before it.
Lease signed
Send a handover plan with the facility contact and the fit-out schedule. Note the renewal date in the record on the day of signing.

Who it is for

This is written for these office park developers.

  • Global capability centres setting up in India
  • IT and IT-enabled services companies
  • Product and start-up companies taking half floors
  • Banks, insurers and financial services back offices
  • Engineering and design firms
  • Consultancies and professional firms
  • Co-working and managed office operators
  • Corporate real estate consultants and tenant advisers

Before you decide

When this may not be the right fit.

  • Your tours end without a named person and a next date, so a follow-up rule would have nothing to attach to.
  • The leasing head is the only person who may speak to the occupier, so a system would only add reminders for work that waits on one calendar.

Before you decide

Agree the work. Know how to judge it.

Follow-up systems for office parks: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

Trace recent enquiries from arrival to the last recorded action. Include a won enquiry, an unsuitable one, and one that went quiet, with personal details removed for the initial discussion.

Make the scope clear

Agree who accepts each enquiry, what makes it qualified, and how ownership changes. Include a rule for missed replies and a clear reason for closing an enquiry.

Check the work in use

Pick an enquiry at random and ask the team to find its owner, latest conversation, and next action. Check that the record agrees with what actually happened.

Know when to change course

If no one has capacity to respond, assign that responsibility before buying more leads. Automation can support the owner, but it cannot replace an unresolved handover.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from office park developers. Anything missing is noted in the written scope, with who will supply it.

The tour log for recent visits
Provide the record of tours, with the date, the company, who attended and what was promised. A diary or a sheet will do. We use it to see where follow-up stopped. Without a log, we start from the leasing head's recall and the first weeks are spent building the log itself.
Answers to questions asked at tours
Ask the technical head and the facility manager to write short answers to what occupiers keep asking, such as parking arrangements or power backup. Plain sentences are fine. These become the written replies sent after a tour. If answers are not confirmed, they are not sent.
A second owner for every stage
Name the deputy for each stage, with their phone and email. The leasing head cannot cover tours, proposals and renewals alone. If no deputy exists, we mark the stage as a risk, and reminders go to the leasing head only, which is the weakness the system was meant to remove.
Dates that occupiers have told you
Gather any date an occupier or adviser has mentioned: a board meeting, a notice period, a target move. Put them against the requirement. A reminder tied to such a date is far more welcome than one tied to a count of days. Where no date was given, the reminder asks for one.
A rule on contacting advisers
Decide how and how far you will chase a consultant who has gone quiet, and who makes that call. Write the rule in a few lines. Without it, the leasing head either chases too hard and annoys a valuable source or leaves a requirement to lapse without a word.

How it works

How the follow up systems work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Read what happened after the last twenty tours

    We go through the tour log and ask what followed each visit: a thank-you, answers to questions, a test fit, nothing at all. You supply the log and your recollection. What exists afterwards is a clear picture of where contact stopped, which shows the stage that needs the firmest rule.

  2. 2

    Decide who owns each stage and who covers

    For every stage from first enquiry to signature, you name a primary owner and a second person who takes over when the first is away or on tour. We write the names beside the stage. The leasing head no longer has to hold every thread, and a stage with no owner is flagged before the system starts.

  3. 3

    Write the answers to tour questions

    From the notes of tours, we list the questions occupiers ask during and after a visit, such as backup load, shuttle routes or fit-out rules, and write a short written answer for each with the technical head. You approve them. After a tour, the right answers go out in writing instead of from memory.

  4. 4

    Tie reminders to the occupier's own dates

    Where an occupier has told you a date, such as a board meeting, a lease expiry or a decision to be taken, we attach the reminder to it rather than to an arbitrary interval. You record the dates the occupier gave. A quiet requirement then reawakens at a time that matters to the occupier.

  5. 5

    Run live requirements through the reminders

    Your leasing team works a few active requirements through the new reminders while we watch which tasks are acted on and which ignored. You say what to keep. The rules are cut to the ones people use, and the second owners are shown how to take over.

  6. 6

    Review the stalled requirements against the record

    We look at the requirements that stopped, set against the figures noted at the start, and ask what the follow-up did at each. You and the leasing head decide whether to change a message, a stage owner or a rule, and which requirements to close. Consultants who have gone quiet are read the same way.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 2, qualification. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Should follow-up be automated?
Reminders can be automated; the messages to a real estate head should be written by a person. We automate the prompt to your team and the sending of packs, and keep the personal notes personal.
How do we follow up with a consultant who has gone quiet?
Send a short update on what changed in the campus, such as a floor freed or a phase approved. Give the consultant a reason to forward you, not a reminder that you exist.
Who should call after a tour, the leasing head or an executive?
The executive calls the same day to confirm what was seen, and the leasing head calls on the term sheet. Each contact has one job. Record who called and what was said, so the occupier hears one story from the campus.
How do we follow up a lease that has stalled on approvals?
Ask the real estate head which internal approval is pending and when it meets. Send the documents that approver will read, in a single note. A stalled lease is waiting on a person, so find the person and prepare their page.
Which parts of follow-up should be automated?
The reminders, the logging and the sending of written answers to standard questions can be automated. The call itself, and any message that discusses terms, should come from a person at the leasing desk, since the occupier wants to speak to someone who can decide. We set the system to remind and to record, and leave the conversation to people. If an automatic message goes out, it names the sender at your campus, and the occupier can reply directly to that person.
Who calls after a tour, the leasing head or an executive?
The person who walked the occupier round should call, because the occupier remembers them. If the leasing head led the tour, they call; if an executive did, the executive calls and the leasing head joins when terms come up. The follow-up record shows who toured and who called, and a second owner covers when the first is unavailable. The decision is yours, and we write it into the stage rules so everyone follows the same pattern.
How much does it cost?
There is no price list, because the work differs by business. The fee is scoped after we have read your brief and spoken to you, and put in writing before anything starts, split into our time, your media spend and production.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.