Rates are compared without the scope
One builder quotes a per square foot rate for the frame and another quotes per cubic metre of concrete. Our price looks high because the scope was never written down.
Output to assess: CRM and order entry connection map
Review whether “CRM and order entry connection map” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
