Rates are compared without the scope
One builder quotes a per square foot rate for the frame and another quotes per cubic metre of concrete. Our price looks high because the scope was never written down.
Output to assess: Approval and permission record
Review whether “Approval and permission record” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the accepted commitment and the later service or contact record, with permission to use the example for review.
Proposed completion check
Inspect a sample record against the original information. Check required fields, duplicate handling, the responsible owner, and who is permitted to access it.
