Strengthening and repair enquiries are hard to handle
An owner of a cracked or old building needs an engineer's report first. We get a phone call and no way to tell whether it is real.
Output to assess: Handover note for the designer
Review whether “Handover note for the designer” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring an anonymised conversation or current selling document, with the task the person was expected to complete.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
