Strengthening and repair enquiries are hard to handle
An owner of a cracked or old building needs an engineer's report first. We get a phone call and no way to tell whether it is real.
Output to assess: Technical evaluation pack
Review whether “Technical evaluation pack” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring a completed opportunity record, its requirement and outcome, and the assumptions used to prioritise it.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
