Architects do not specify our plant by name
AAC is written into drawings as a generic material, and the builder buys from whoever quoted last.
Output to assess: Completeness checklist
Review whether “Completeness checklist” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
