Skip to content
GullySales

EV charging equipment manufacturers · Website

Build a website where a society, a fleet and an operator each find their answer.

A website for a charger maker is the place where a site owner checks the unit, the fit and the route to installation before writing in. GullySales plans the pages, the technical tables and the enquiry form, and keeps rules and incentives off the page unless dated.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Realistic editorial illustration of electrical equipment manufacturers at work in India

What website means

A website is the page a customer lands on after searching, clicking an advert or scanning a code, and it decides whether they call or leave. GullySales builds and maintains sites that load quickly, explain the offer plainly and make the enquiry form or phone number easy to find.

Last updated 14 Nov 2026.

For EV charging equipment manufacturers

Where it usually goes wrong, and what we would do.

  • “The homepage must split the buyers early”

    A secretary, a fleet head and an operator arrive with different needs. A homepage that lists products first makes each of them hunt. Three clear entry points by buyer type send each to the page that answers their case.

  • “The engineer reads the specification before the brochure”

    An operator's engineer scrolls to connectors, protocol and platform support. A page with those facts in plain tables is trusted. A downloadable brochure that must be opened and read offline loses the visit.

  • “The enquiry form is the sales filter”

    A form asking only name and phone brings every curious visitor. A form asking load, parking count and meter distance brings fewer, better enquiries. The extra questions are a service to the sales team.

  • “Service and installation answers belong on the site”

    A buyer wants to know who installs, who services and where the engineer is based. A page that names installer routes and service locations answers the worry that stops a first purchase.

What we do

What we deliver for EV charging equipment manufacturers.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Buyer-type entry pages

    Separate pages for societies, fleets, dealerships, malls, fuel stations and operators.

    Result: Each buyer reaches a page that speaks to their case.

  2. Product and specification pages

    Unit pages with connectors, rating, protocol and platform support in plain tables, checked by your engineers.

    Result: An engineer can verify fit without a phone call.

  3. A site enquiry form

    A form with load, parking count, meter distance and vehicle types, linked to your record system.

    Result: Every enquiry arrives with the facts the engineer needs.

  4. An installer and service page

    A page listing partner installers and service coverage by town.

    Result: A buyer sees who will install and maintain the charger.

  5. Technical and speed fixes

    Page structure, loading and mobile layout checked so pages read well on a phone.

    Result: The site works for a secretary reading on a phone.

How the result is measured

  • Page load time
  • Bounce rate
  • Enquiries from the website

Recorded as a baseline before work starts, so every later report has an honest comparison.

Searches your buyers type

What a society, fleet or operator looks for on a charger maker's site, and the page that answers it.

charger specification sheet download
A product page with connector, power rating, ingress protection, protocol support and mounting options in a table. Engineers read this before the brochure.
EV charger for society installation process
A process page: site visit, load check, quote, approvals, installation and commissioning. State who does each step and what the society must arrange.
charger compatibility with CMS software
A page listing the operator platforms you have tested and the protocol versions supported, with the date of last testing. Do not list a platform you have not tried.
EV charger service and spare parts
A service page naming the cities covered, how a fault is reported and what the warranty includes. It answers the operator who worries about downtime.
request site assessment
A form asking for site type, sanctioned load, bays and a location pin, with a note on what the engineer will do next. It filters out the curious.

Who it is for

This is written for these EV charging equipment manufacturers.

  • AC charger makers for homes, societies and offices
  • DC fast charger makers for highways and fleets
  • Two-wheeler and three-wheeler charger makers
  • Bus and commercial fleet charging makers
  • Battery swapping station builders
  • Charger makers with their own software and app
  • White-label suppliers of chargers to operators
  • Suppliers of charging cables and connectors

Before you decide

When this may not be the right fit.

  • The specification tables have not been checked by an engineer, and a wrong rating on a public page can lose a tender
  • You have no way to reply to a site assessment request, and the form would leave buyers waiting

Before you decide

Agree the work. Know how to judge it.

Website for EV charger makers: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

List the pages that support a buying decision and the actions visitors must complete. Keep examples of failed forms, unclear product information, and questions your team answers repeatedly.

Make the scope clear

Agree the page list, content ownership, integrations, and who controls the domain and hosting. Include redirects and existing search traffic in a redesign brief, before changing addresses.

Check the work in use

Complete a real enquiry journey on a phone and a laptop. Check that the confirmation appears, the enquiry reaches the right person, and tracking records the action once.

Know when to change course

If visitors can enquire but the team does not follow up, start with the sales handover. A larger website will not resolve that delay.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from EV charging equipment manufacturers. Anything missing is noted in the written scope, with who will supply it.

Domain and hosting logins
The registrar and hosting accounts, with the owner's name on them. We need them to publish and to point the address. If a former agency holds them, recovering control comes first, and it delays the build.
Current datasheets and drawings
The latest datasheet for each unit and any drawings you are willing to publish. Specification pages are built from them. Out-of-date papers mean the table is left blank until your engineer supplies the right ones.
Photographs of installed bays
Pictures of commissioned sites, with the owner's permission to show them. They give the site its credibility. Without them, the pages use clean product images and diagrams, and sites are added later.
A decision on prices and incentives
Your choice on whether prices appear and whether incentives are mentioned. Check the current rules with the relevant authority and your own adviser. If undecided, the site shows neither, and the enquiry form handles both.
A list of cities where you install
The places where your own or partner crews can install and service. The service page and the form use it. If the list is uncertain, we leave places out rather than promise cover you cannot give.

How it works

How the website work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    List what the site must answer for each buyer

    We start with the questions in your enquiry log: a society asking about supply, a fleet asking about charging time and an operator asking about software. You tell us which buyers the site must serve first. From this we draw up the list of answers each buyer should find, and the site is built around it.

  2. 2

    Take the access and content already held

    We take control of the domain, hosting, current pages, datasheets, photographs and installation lists. You tell us who holds each login. After this step we know what exists, what is old and what is missing, and we can see which files your engineers must supply.

  3. 3

    Draw the sitemap and the opening page

    We draw the pages from the buyer's route: the opening page splits society, fleet and operator, each with its own entry page, then product, specification, service and enquiry. You approve the layout and the order. Your engineer checks the specification tables on paper before they are built.

  4. 4

    Build the pages on a test site

    We write the content and build it on a private copy. Technical tables, drawings and datasheet links are checked by your engineer, and the enquiry form is built with the site questions you approved. You review the test site on a phone and a desktop, since a society secretary opens it on a phone first, and your service head reads the installer page. The live site stays as it is until you approve the switch.

  5. 5

    Try the form and the service answers

    We submit enquiries as each buyer type and follow them to your inbox or sheet, then ask a service engineer to read the installer and service page. Gaps in the form, the reply or the routing are fixed. After this step, a real enquiry reaches the right person with the site details.

  6. 6

    Launch, then compare enquiries with the baseline

    After your approval the site goes live, and we check redirects, speed and the form on the real address. We then compare the enquiries, their quality and the quotes that follow with the figures recorded before. You also receive the logins and a short guide to editing, so the site stays yours.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 1, prospecting and lead generation. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Should the site show prices?
That depends on how your quotes work. Some units are quoted after a site visit, so a page may show what affects the quote rather than a figure. GullySales shapes the page with your sales team around that.
Can we list incentives on the site?
Link to the relevant authority and explain how to check the current rule. Incentives differ by state and change, so printed figures go stale and the buyer who finds the mistake stops trusting the rest.
Should the site list the cities where we install?
Yes, name only the cities where you or a partner can attend. A buyer in an uncovered city who fills the form wastes both sides' time. If a partner covers a city, say so and name the partner after agreeing it with them.
Do we put downloadable drawings on the site?
Put general mounting and dimension drawings, and keep site-specific drawings for the quote. Public drawings need an engineer's sign-off and a revision date. An out-of-date drawing downloaded years later can cause an installation error.
Who looks after the website after it goes live?
You do, with our help if you ask for it. At handover we give you the logins, a short written guide to changing text, adding a unit and checking the form, and the list of what we set up. Your own person can then update datasheets and photographs. We do not keep the site tied to us. If you want ongoing support for changes, technical fixes or new pages, that is agreed separately, and you can stop it without losing the site.
Should the site have a login area for installers and dealers?
Only if you have material that should not be public and a person to look after access. A login area for price lists, drawings or training needs accounts, resets and checks on who still works for a partner. If those are not in place, send the files on request. We can plan a simple partner page first and add a login later when the need is clear. Decide who approves each partner before any access is granted.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.
What do you need from us?
Your brief, and a conversation. After that, access to whatever this work touches, such as your website, your accounts or your enquiry record, and time with the people who handle your enquiries.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.