Skip to content
GullySales

PCB assembly companies · Website

Build a site where an engineer checks the line and sends the files.

A website for a PCB assembly company is the place where an engineer checks your capability and sends a BOM. GullySales plans the pages, the technical detail and the intake form so that a buyer can judge fit and act without a phone call.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Realistic editorial illustration of electrical equipment manufacturers at work in India

What website means

A website is the page a customer lands on after searching, clicking an advert or scanning a code, and it decides whether they call or leave. GullySales builds and maintains sites that load quickly, explain the offer plainly and make the enquiry form or phone number easy to find.

Last updated 14 Nov 2026.

For PCB assembly companies

Where it usually goes wrong, and what we would do.

  • “The engineer reads for specifics”

    Placement range, smallest component, inspection method, test options and board types are what is checked. A site of general claims and stock images gives them nothing to compare, and they move to the next shop.

  • “The form decides how clean the enquiry is”

    A form with only a name and message produces vague contacts. One that asks for files, quantity, turnkey or consigned, and target date produces enquiries the estimator can open and price.

  • “Trust is shown by process, not slogans”

    Photographs of your own line, a list of quality steps and a clear statement of ESD controls tell a purchase team more than a banner. Certificates should be shown only if currently valid, with the issuing body named.

  • “Phones carry the first visit”

    A founder opens the site from a phone while forwarding files. Pages must load properly and the form must work with a thumb. A site that looks fine only on a desktop loses that visit.

What we do

What we deliver for PCB assembly companies.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Page structure by service and buyer

    Home, services, turnkey, consigned, box build, testing, capability and contact pages, each with a clear job.

    Result: A buyer finds the page for their own need.

  2. Capability page with real detail

    Machines, ranges, inspection and tests written in plain technical text.

    Result: An engineer can check fit against a board.

  3. BOM intake form

    Fields for files, quantity, model and date, with a note on what is missing.

    Result: Each enquiry arrives with its files or a named gap.

  4. Photography brief for the floor

    A shot list and permission rules for images of the line and equipment.

    Result: The site shows your own plant and no customer board without consent.

  5. Clean phone layout

    Layout and form checked on common phones before launch.

    Result: The form works on a phone, tested by a person.

  6. Handover and edit access

    Training so your team can update capability details when equipment changes.

    Result: You can edit a capability line yourself.

How the result is measured

  • Page load time
  • Bounce rate
  • Enquiries from the website

Recorded as a baseline before work starts, so every later report has an honest comparison.

Searches your buyers type

Build the pages an engineer checks before sending the files.

A visitor reads for specifics. Each row is a search or a worry and the page that meets it.

PCB assembly capability SMT through-hole
A capability page in plain text: board sizes, component sizes, line types and test steps, so an engineer finds a fit or a limit.
turnkey PCB assembly component sourcing process
A sourcing page explaining authorised channels and the shop's shortage routine, answering the counterfeit worry.
send BOM for PCB assembly quote
The intake form with file upload, listing what is needed and what the buyer gets back, placed on every service page.
PCB assembly quality certifications ESD
A quality area with the certifications the shop actually holds, ESD controls and test methods, set out with images of the floor.
EMS company box build
A box build page with enclosure and harness work, so buyers who want one vendor see the full route.

Who it is for

This is written for these PCB assembly companies.

  • Prototype and low-volume SMT assembly shops for startups
  • Turnkey assemblers who source components for OEMs
  • Consigned-parts assembly for brands that buy their own components
  • High-mix, low-volume lines for industrial and medical electronics
  • Automotive and EV electronics assemblers
  • Box-build and final assembly providers with enclosure and harness work
  • Contract manufacturers for consumer and IoT products
  • Rework and repair houses for expensive boards

Before you decide

When this may not be the right fit.

  • The line's capability is not yet written down by anyone who runs it, so the pages would be guesses.
  • You hold no certification you can show, and a quality page would show empty claims.
  • The current site already converts and the delay is in the quote, which a new site would not fix.

Before you decide

Agree the work. Know how to judge it.

Website for PCB assembly companies: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

List the pages that support a buying decision and the actions visitors must complete. Keep examples of failed forms, unclear product information, and questions your team answers repeatedly.

Make the scope clear

Agree the page list, content ownership, integrations, and who controls the domain and hosting. Include redirects and existing search traffic in a redesign brief, before changing addresses.

Check the work in use

Complete a real enquiry journey on a phone and a laptop. Check that the confirmation appears, the enquiry reaches the right person, and tracking records the action once.

Know when to change course

If visitors can enquire but the team does not follow up, start with the sales handover. A larger website will not resolve that delay.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from PCB assembly companies. Anything missing is noted in the written scope, with who will supply it.

Equipment list and line description
The capability page depends on real equipment and steps. A page from your plant head is enough. Without it, the page is general, and the engineer leaves to find a shop that is specific. Add the board sizes and package types you place, as an engineer will look for them first.
Photographs or a morning for them
Trust is shown by process. Provide existing photos of the line or a time when we may shoot with operators' consent. Without images, the site uses diagrams. If operators appear, the consent is written down, so a photograph can be removed on request.
Domain and hosting logins
We cannot launch without control of these. The person who registered the domain provides them, and the registration should be in the company's name.
A statement of certificates actually held
Show only what a certificate or audit covers. Your quality head supplies the scope in writing. Without it, the site makes no claim about standards. Bring the certificate itself, so the scope in the page matches the scope on the paper.
A person to receive the BOM form
The form needs a named recipient who replies. Tell us who covers absence. If it goes to a general inbox, test enquiries sit unanswered. Say what happens when the form reaches the estimator while they are on the floor, so the reply is not left waiting for a free afternoon.

How it works

How the website work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    List the buyers and what each looks for

    We write down what the prototype founder, the design engineer and the purchase head each hunt for on a page: capability, files, process, proof. You correct the list. The result is a page structure by service and by buyer, not a list of company departments. We also mark the pages a buyer would reach from a search, a profile or a message, so each of those entrances leads somewhere useful.

  2. 2

    Get the site access and the existing material

    We collect the hosting login, the domain details, equipment lists, process notes and the existing pages. You say who may approve technical wording. We record how the site is found and what arrives on the form today. We ask which pages bring enquiries today, so nothing that works is removed in the rebuild.

  3. 3

    Draw the pages and the BOM intake form

    With your estimator we draw the sitemap and the form fields: BOM, Gerber pack, centroid, quantity, turnkey or consigned. Capability, process and quality pages are planned with real detail. Nothing is designed until you have agreed the sitemap and the fields on the form.

  4. 4

    Photograph the floor and fill the test site

    On a visit we shoot the line with the operators' consent and leave out customer boards. Pages are written with real equipment and steps and placed on a private test site. Your process person reads every technical line. We add a short process page that describes how a BOM moves from review to quote, with the names of the roles involved and nothing about timing.

  5. 5

    Check the phone layout and the form

    Phones carry the first visit, so we open every page and the form on a phone. Your staff send a test BOM and see where it lands. Slow images, tiny text and enquiries reaching no one are fixed before launch.

  6. 6

    Go live and read what arrives

    After launch we confirm the form reaches the named person, that edit access is yours, and that the old addresses redirect. Against the starting figures we read visits, forms with files and quotes sent. You decide which pages to change, and the estimator reports any enquiry that arrived without files so the form can be adjusted.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 1, prospecting and lead generation. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Can we list our customers on the site?
Only with each customer's written consent. Where it is not given, describe the segments you serve, such as industrial or medical electronics, without naming a brand.
Do we show certifications?
Show those that are current and held by your company, with the issuing body named. Never show a certificate that has lapsed or one that belongs to a partner. Your quality head signs off the wording.
Should the site quote prices?
Board pricing depends on the BOM, lot size and parts, so a fixed price list misleads. Explain what drives the price and ask for the files. That sets honest expectations and filters casual price checks.
Can we list our customers on the website?
Only with each customer's written agreement. Assembly orders can be confidential, and a logo can reveal a product plan. Show the process, the equipment and the sorts of boards handled instead. If a customer agrees, record it and keep the permission with the account.
Should the site have a page for each machine?
Only if buyers search or ask for it. A buyer cares about what the line can build, so group equipment under capability pages by board type and process, and name the machines where the detail helps an engineer judge you. A page for each machine thins the site and invites outdated information. Your process person decides which equipment to name, and the page records what changes when a machine is added.
Do we need a customer portal for quote status?
Not at the start. A portal needs data, upkeep and security that a small shop may not have. Begin with a clear form, a prompt reply and a status message from the CRM or WhatsApp. If buyers keep asking for status, review a portal later with your web person, and decide who maintains it before anything is built.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.
What do you need from us?
Your brief, and a conversation. After that, access to whatever this work touches, such as your website, your accounts or your enquiry record, and time with the people who handle your enquiries.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.