RFQs sit unanswered while the buyer moves to the next vendor
A drawing arrives by email while the quoting engineer is on the shop floor. The reply goes out four days later, with no tooling lead time stated. By then the buyer has already sent a sample order to a competitor who replied within a day.
Output to assess: Pricing calculation sheet
Review whether “Pricing calculation sheet” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring an anonymised conversation or current selling document, with the task the person was expected to complete.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
