Quality proof sits in a drawer
The BIS licence, the test certificate and the heat number record exist, but a builder's engineer cannot get them without a phone call. The engineer moves on to a mill that sends a link.
Output to assess: Basic capture rules
Review whether “Basic capture rules” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring the original enquiry record, its changes, the people involved, and any handover that required rework.
Proposed completion check
Trace the output back to the selected source record. The reviewer distinguishes confirmed information from assumptions and records any unmet requirement before accepting the handover.
