Check that a signed roof reaches a running plant, with a name against every step.

Customer onboarding implementation assurance for a commercial solar EPC company checks that each signed roof is moving to a commissioned plant the owner can see running, not only a project with a start date. GullySales reviews the handover, builds the first-value checklist and the dependency log, and keeps the risk list under review while your project team delivers.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

A solar engineer and factory manager review a rooftop installation

What customer onboarding implementation assurance means

Customer onboarding implementation assurance checks that each new customer's onboarding is actually finished, not just started. GullySales reviews the sales handover, builds the first-value checklist, names an owner for every open item, and keeps a risk list under review until the customer is live.

Last updated 14 Nov 2026.

For commercial solar EPC companies

Where it usually goes wrong, and what we would do.

  • “A signed order is not a plant that generates”

    The order is signed and the sales engineer moves on to the next roof. The customer waits for a date, hears nothing, and calls the plant head, who knows less than the customer does. Between order and commissioning sit a structural check, material delivery, installation, the utility's inspection and the first generation. Assurance defines what live means for this customer, a named point where the plant generates, the monitoring login works and the owner's staff can read it, and keeps the steps visible until then.

  • “The customer owes papers and nobody chases them”

    A roof project waits on things only the customer can supply: access to the roof, a shutdown window from the plant head, structural drawings or a certificate, the sanctioned load papers, an authorised signatory for the utility application, and sometimes a lender's sign-off. Each request was made once, in a call. The dependency log records who asked, when, and what is still open, so a delay is traced to a document and not blamed on the installation crew.

  • “The person who bought is not the person who receives the plant”

    The owner or the finance head approved the order. The plant head, the maintenance team and the security desk will live with the roof. If they were never told about work on the shed, crane access or a shutdown, they refuse entry on the morning the crew arrives. The assurance review lists the people affected on the customer's side and asks the project lead to brief each of them before the date is fixed.

  • “Promises from the survey go missing”

    The sales engineer told the finance head that the system would be sized to the bill, with a named inverter make and a monitoring link. The project team received a drawing. The handover completeness check compares what the buyer was told with what the project team holds, and lists the gaps for the delivery lead to resolve before material is ordered, not after the roof is half built.

What we do

What we deliver for commercial solar EPC companies.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Handover completeness check

    A review of the sales-to-project handover for one named roof: why the owner bought, the capacity and equipment named in the proposal, the bill the sizing was based on, the contacts on both sides and the unresolved questions. Gaps are listed against the proposal, and your delivery lead confirms or corrects each one.

    Result: Each gap between proposal and project file is listed with a name beside it.

  2. First-value checklist for the plant

    A written definition of what the owner should see first: the plant exporting, the monitoring app showing generation, a handover pack received and the owner's staff shown where the isolators are. Each step carries the evidence that proves it, such as a commissioning certificate or a dated screenshot.

    Result: Live is a set of evidence items, not a feeling in the project team.

  3. Named-owner register

    One row per open item with one named person at your company and, where it applies, one at the customer. Rows that carry a team name are returned until a person is named. Items cover the structural check, the utility file, delivery, installation and commissioning.

    Result: Every open item has a single named person on it.

  4. Customer dependency log

    A list of everything the customer must supply or decide: roof access, a shutdown window, structural papers, load sanction documents, a signatory and any lender approval. Each line gives why it is needed, who asked, the date asked and its current status, so a stalled roof can be explained from the page.

    Result: A stalled roof can be traced to an open dependency with a date.

  5. Risk list with review notes

    A short plain list of risks to this plant going live, such as a roof that needs strengthening, a customer contact who has left, a utility inspection not yet booked or a delivery of equipment that has slipped. Each risk has an owner, a next action and a note each time it is reviewed.

    Result: Risks appear on the list before they appear as a complaint.

  6. Go-live confirmation and open-items handover

    A one-page record that the checklist is complete, signed off by your project owner and acknowledged by the customer's plant head. Items still open pass to a named account owner, such as the maintenance arrangement or a second roof the owner has mentioned.

    Result: The customer holds a signed record of what live meant, and open items have an owner.

How the result is measured

  • Handovers complete against the sale at the point of acceptance
  • Customers who reach the agreed first value, separate from customers who were sent a welcome message
  • Open dependencies on the customer's side, with the date each was first requested

Recorded as a baseline before work starts, so every later report has an honest comparison.

Who it is for

This is written for these commercial solar EPC companies.

  • Rooftop EPC specialists for factories and industrial units
  • Warehouse, cold storage and logistics park rooftop installers
  • Campus installers for schools, colleges and hospitals
  • Pay-per-unit (OPEX) rooftop developers
  • Open access and group captive solar developers
  • Ground-mount and solar carport contractors
  • Government and public sector tender EPC companies
  • Operations and maintenance firms adding new installations

Before you decide

Agree the work. Know how to judge it.

Customer onboarding implementation assurance for commercial solar EPC companies: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

Map what the customer has been promised and what happens after the order. Gather the questions that repeatedly delay the start of delivery or use.

Make the scope clear

Agree the sales-to-delivery handover, customer responsibilities, and the point at which onboarding is complete. Name the owner of each unresolved dependency.

Check the work in use

Follow a recent customer from order confirmation to their first useful outcome. Check that they received the right instructions and know where to ask for help.

Know when to change course

If the sale includes a promise delivery cannot fulfil, correct the promise and handover. An automated welcome message will not resolve that gap.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from commercial solar EPC companies. Anything missing is noted in the written scope, with who will supply it.

The proposal and the order
The signed proposal, the sizing basis, the equipment list and the payment milestones. The review compares them with what the project team holds. If the proposal was revised by message, share the messages too, since the gap can sit there.
The project tracker and site notes
Whatever the project team uses now, whether a sheet, a board or a chat. The checklist must fit it. Where nothing exists, tell us, and the register will be built as a plain shared sheet your team can keep.
Names at the customer
The owner, the finance head, the plant head, the maintenance lead and the security desk. Onboarding stalls when the person who signed is not the person who lets the crew in. Missing names appear on the risk list until someone fills them.
Utility and permission papers in hand
The utility application, inspection and net metering papers your company holds for this roof, and who signs them. Your company prepares and the customer's authorised person signs; the file shows which stage it has reached. If the status is unknown, that is itself listed as a risk.
A project owner who will sign off
One named person who accepts go-live and reads the review. Without them items stay open as everyone's task and no one's, and the confirmation record has nobody to sign it.

How it works

How the customer onboarding implementation assurance work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Choose one roof or a sample

    You tell GullySales whether to assure one named roof now under way, or to audit a sample of recent installations. You share the proposal, the order, the project tracker, the messages and the handover notes. Where records are missing the gap is noted, and nothing is guessed.

  2. 2

    Test the handover against the survey

    GullySales compares what the buyer was told with what the project team holds: sizing basis, equipment, who files with the utility, payment milestones and access conditions. Each missing promise or constraint is listed, and your sales head and project lead decide how it is settled.

  3. 3

    Define live and name the owners

    With your project owner we write the first-value definition and the checklist behind it. Each step gets a named person on your side, and the customer's own tasks are listed apart. The plant head reads the definition before it is fixed, so the customer agrees what live means.

  4. 4

    Build the dependency log and risks

    We list what the customer owes you and what could stop commissioning, from roof access to the utility's inspection. Your project team confirms each entry and adds what the papers do not show. The customer is contacted only with your agreement in advance.

  5. 5

    Review until the plant is live

    GullySales reads the tracker with your project owner at the review points you agree, checks the evidence against each step and updates the risk list. A step marked done without evidence goes back to open, and a risk with no action is raised again at the next review.

  6. 6

    Close out against the first figures

    At commissioning you receive the confirmation record and the open-items handover. For an audit you also receive the practice report with fixes ranked. Both are read against the figures recorded before the work began, such as handovers complete and items with no owner, and your team decides what to adopt.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 7, after the sale. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

What does onboarding mean for a commercial solar installation?
It is everything between the signed order and a plant the owner sees running: the structural check, material delivery, installation, the utility's inspection and commissioning, plus the customer's papers and access. Assurance checks that this is finished, not just started, by defining live, naming an owner for each step and reviewing the risks.
Will GullySales run the installation or talk to our customer?
No. Your project team installs, decides and speaks to the customer. GullySales checks and flags, and contacts a customer only with your agreement in advance. A flagged item that nobody acts on stays open on the list, visible to your project owner.
How is this different from a project schedule?
A schedule shows tasks and dates. Assurance asks whether the handover matched the sale, whether the customer's dependencies are open, whether each step has evidence and whether anyone owns the risks. It sits beside your schedule and catches what a schedule does not show, such as a promise the project file never received.
Can it be used on one roof, or only across all our projects?
Both. You can assure one named roof while it is under way, or ask for an audit of a sample of recent installations to see where the pattern breaks. The audit gives a ranked report of fixes, and your team decides which to adopt. The choice is made in the first step.
What if the customer delays the papers?
The dependency log records what was asked, when and by whom, so the delay is visible and dated. Your project owner chooses how to follow up, and the register shows when an open customer item blocks the next step. That record also supports a calm conversation with the customer instead of a dispute.
How will we know it worked?
Read the measures: handovers complete against the sale, plants that reached the agreed first value, open customer dependencies with their first-request dates, and items with no named person. GullySales reads them with your project owner against the figures recorded before the work began. No outcome is promised, and your team decides what stays.
How much does it cost?
There is no price list, because the work differs by business. The fee is scoped after we have read your brief and spoken to you, and put in writing before anything starts, split into our time, your media spend and production.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.