Skip to content
GullySales
← All articles

Notes for owners · Industry playbooks

How industrial buyers decide which unit gets the RFQ

What industrial buyers check before sending an RFQ, across nine manufacturing trades, and where a unit drops off the shortlist.

The GullySales team · Updated 13 Nov 2026 · 6 min read

Editorial illustration for How industrial buyers decide which unit gets the RFQ
On this page
  1. Who sends the drawing, and to whom?
  2. What does a buyer check first?
  3. Why does the first quote matter so much?
  4. What proof can a unit show, and what can it not?
  5. An example from a gasket maker
  6. How should the quote itself be laid out?
  7. What happens after the quote goes out?
  8. How do you read a lost enquiry?
  9. What should the owner and the sales engineer each own?
  10. What should you change first?

An industrial buyer sends the drawing to the units that look able to make the part and that the buyer can check in a few minutes, then favours the first reply that asks a sensible question and carries a number. Capability the buyer can verify gets you onto the list. The quote decides the order. Across the nine trades on the manufacturing section page, from CNC shops to chemical makers, the buyer is an engineer or a purchase manager whose job is to avoid a bad supplier, so a missing document ends the conversation before price comes up.

Who sends the drawing, and to whom?

The enquiry is a document: a drawing, a DXF, a datasheet, a bill of quantities, a sample request. It travels from IndiaMART, a directory, a trade fair or a referral, and it goes to three or four units at once. Some of the senders are buyers. Some are people collecting rates to hold against an existing supplier. You cannot tell which from the first message, so the first reply has to work for both.

What differs by trade is who else weighs in. A consultant or a contractor picks an electrical equipment maker before the buyer sees the brand. The buyer's own lab tests a chemical maker's sample. A packaging unit is chosen on a sample and a rate, then ordered on a schedule.

What does a buyer check first?

Buyers look for proof they can open and read without calling. Here is the order most of them follow.

StepWhat the buyer looks forWhere a unit drops off
1. Can they make it?Machines, sizes, materials and grades, tolerances heldA page that says "quality is our priority" and lists none of these
2. Are they real?Address, certificates, a named person, a similar partA single page with a phone number
3. Will they reply?The first response to the RFQA shared inbox nobody owns
4. Is the quote usable?Price, lead time, what is assumed, what is excludedA rate with no conditions, or a quote that takes a week
5. Will it repeat?Sample approval, delivery on the date promisedA sample sent and never chased

A CNC machining shop is judged hard at step 1, and a plastic injection moulder at step 5, where the sample approval decides the production order. The lead generation page for CNC shops goes through the enquiry route in more detail.

Why does the first quote matter so much?

The buyer has four tabs open and a deadline. The unit that replies with a clarifying question, such as the finish required, the heat treatment or the quantity per release, looks like a unit that has made this before. The unit that replies "send details, price on request" looks like a trader.

Speed on its own is not the point. A quote sent in an hour with the wrong assumption comes back as a dispute. A quote that states its assumptions and goes out while the buyer is still comparing is the one that gets read. So the log matters: every drawing recorded, who is costing it, when it went out and when somebody will ask what happened. Without that record you do not know whether you lose orders on price or on silence.

What proof can a unit show, and what can it not?

Keep these current and easy to send: the ISO certificate, the material test report format, the MSDS for a chemical, the list of machines, a drawing or photograph of a comparable part, and one customer who will take a call.

Customer names are the hard part. Some OEMs and defence suppliers refuse to be named, and a purchase agreement may carry a confidentiality clause. An industrial automation company feels this most, because its best installations are the ones the customer keeps private. The way round is to describe the application, the problem and the result in the customer's own terms and leave the name out. Safety and quality documents also differ by product and by buyer, so ask your own adviser what each customer needs.

An example from a gasket maker

For example, a rubber maker near Hosur gets an RFQ for a rubber gasket from an OEM in Chennai. The compound is named in the email: EPDM, a hardness, a temperature range. The unit's website has a single page titled Products, so the buyer's engineer checks two other makers whose pages show the compounds they mix.

A rubber manufacturer that has written one page for each compound, with the temperature range, the standard and a sample drawing, gets the engineer's second look. The factory is the same. The page answered the application before the sample arrived.

How should the quote itself be laid out?

Treat the quote as a document the buyer will forward to a manager who has not seen the drawing. Put the part number and revision at the top, so nobody wonders which version was priced. Then list the quantity the rate applies to, the material and grade, the finish, the packing and the delivery terms. Add a short block headed Assumptions: the tolerance you read from the drawing, the inspection you will provide, who supplies the raw material and whether tooling is charged separately.

A manager reading that block can tell at a glance whether three quotes are comparable. Without it, the cheapest quote wins because it hides the most. A unit that writes its assumptions down loses a few orders to a careless competitor and keeps the buyers who have been burned by one.

What happens after the quote goes out?

Some units stop at sending. The buyer, meanwhile, is waiting for the other two quotes, taking a view from the purchase head and asking the stores team about the last delivery from each shortlisted unit. A follow-up that arrives in that window, with an offer to send a sample, a plant visit date or a revised rate for a larger release, is read as interest. A follow-up that only asks "any update?" is read as pressure.

Decide who calls, with which document in hand, and what question they will ask. A good question is specific: which of the two finishes is the drawing asking for, or does the buyer want the sample before the order. Record the answer in the log, because it tells you what the buyer is actually comparing.

How do you read a lost enquiry?

A lost RFQ is data if someone asks. Send one short message to the buyer: thank them, say you would like to quote better next time, and ask whether the decision came down to price, lead time, capability or documents. Not every buyer replies. The ones who do tell you which row of the table above you failed on.

Keep the answers in one sheet. After a run of lost enquiries you will see a pattern, such as a certificate nobody could find, a lead time longer than the buyer's schedule, or a part family you never make well. Each pattern points to a different fix: a document folder, a conversation about capacity, or a decision to stop quoting that part.

What should the owner and the sales engineer each own?

Split the work so that nothing waits on one person. The sales engineer owns the log, the first reply and the follow-up. The production head owns the feasibility check and signs off the lead time. The owner reads the lost-enquiry sheet and decides which parts the unit will stop quoting.

When these roles are blurred, drawings sit in the production head's inbox while the sales engineer assumes it has been costed. The buyer meanwhile sees a unit that went quiet. Write the three roles on one page, stick it where the team sits, and name a stand-in for each role for the days when the person is on the shop floor or travelling. A role with no stand-in is where an RFQ stalls, and a plant that runs two shifts needs a stand-in for each shift, and the buyer does not wait for the stand-in you never named. Review the page whenever a person joins or leaves, and again when a new product line starts.

What should you change first?

Start with the RFQ, because it is the cheapest to fix. Give every enquiry one owner, keep a log with three columns (received, quoted, followed up) and ask every buyer who will approve the sample and by when. After that, write the capability page for the process you most want more of, in the words a purchase engineer types, with sizes, grades and standards.

If you want a second pair of eyes on where drawings go missing between the inbox and the quote, tell us what you need. We will read your brief and talk to you, and the scope, fee and term for any work are agreed in writing afterwards.

Put the reading to work

Try this with your own records.

Review orders by buyer type, offer, and route to market. Include lost proposals and capacity limits so the plan reflects what the team can actually sell and deliver.

How to review the result

Check whether the plan explains where the next suitable opportunities will come from and why buyers would choose you. Each priority needs an owner and a way to review progress.

Questions

Questions owners ask.

Why do buyers send one drawing to several units?
Because a purchase engineer is paid to avoid a bad supplier, and comparing three quotes is the cheapest protection. It also means your quote competes on more than price. Clear questions, a sensible lead time and visible capability count at the same time.
Is a certificate enough to get on the shortlist?
It keeps you on the list. It does not put you on it. Buyers check the certificate after they have found a unit that looks able to make the part, so the machine list, material grades and a similar part come first.
Should we quote every enquiry we get?
No. Enquiries from people collecting rates, parts outside your machines and quantities below your minimum cost more in engineer time than they return. Write down your own rules for what you quote, and say politely when you are not the right unit.
How do we handle a buyer who will not let us name them?
Describe the part, the process and the tolerance and leave the name out. Many OEMs forbid naming. Read your purchase agreement before publishing a photograph of a part, and ask the customer when you are unsure.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design. One written way to sell, from first enquiry to repeat order.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.