Skip to content
GullySales

Notes for owners · Business growth

How to build a media plan

A media plan is a document, not a decision: one row per vehicle, real dates, the production money, and one number each line is judged on. Most plans fail on the rows nobody made specific.

The GullySales team · Updated 21 Sept 2026 · 8 min read

A media plan is a document, not a decision. The decisions belong in the campaign brief: who the buyer is, what the offer is, where and when. The plan is the schedule that spends the money, one row per thing you are buying, with real dates, real costs and a named owner. Its job is to let four people argue from the same page before anything is booked, and to let you check afterwards whether you got what you paid for.

One row per vehicle, and the row has to be specific

The line that ruins plans reads "Outdoor, Bengaluru, ₹X". That is a budget, not a plan. A row is one thing you can photograph.

ColumnWhat goes in it
MediumHoarding, radio, cinema, search, newspaper, metro
VehicleThe exact site, station and panel, screen and show time, publication and edition, station and band
GeographyThe road, the ward, the pin codes, the catchment in travel time
DatesStart and end as calendar dates, not "4 weeks"
UnitsSpots, insertions, panels, weeks, impressions bought
Media costThe seller's charge for the space or time
ProductionPrinting, mounting, recording, artwork, certification
OwnerA person's name, not a department
Judged onThe one number this line answers for

The last column is the one most plans do not have, and it is the reason a review meeting turns into an argument. A hoarding is judged on branded searches and calls to its own number from that catchment. A search campaign is judged on cost per qualified enquiry. A trade magazine is judged on meetings with the right job title. A line with no number against it is a donation.

The calendar strip is where the mistakes show up

Under the grid, put weeks across the top and vehicles down the side, and shade the weeks each one runs. It takes ten minutes and it exposes things a table hides.

You will see the hoarding going up in week one while the landing page is not ready until week three. You will see the newspaper insertion landing on the Monday the showroom is shut for stock-taking. You will see four vehicles all starting and stopping together, so that when the enquiries move, nothing can be separated from anything else.

Put the non-media rows in the same strip: creative approval, printing, the day the tracking number goes live, and the weeks your team is away. Then mark the blackouts. Board exam weeks empty out anything aimed at families. Ashada is thin for gold and vehicles. The week of a big local election takes inventory out of the market altogether.

Give search and Maps a continuous line from day one. Every other medium in the plan sends people to search your name. A brand that cannot be found on the evening somebody remembers it has paid for a competitor's traffic.

Lead times decide more of the plan than the budget does

Each medium has a floor on how quickly it can start, and the plan has to be built backwards from the slowest one.

  • A hoarding needs the site confirmed, the artwork at the exact size with its safe area, printing, and a mounting slot. The flex is the fastest part.
  • A cinema slide or film needs certification before it can be screened, and that is a queue you do not control.
  • A radio spot needs a recording with the right voice, and a Kannada version is a fresh recording rather than a translation.
  • A newspaper booking depends on the day, the edition and the position, and the good positions for a Sunday go first.
  • Metro, airport and mall media need the property's approval of the artwork, and sometimes a deposit, before production starts.
  • Search and social can be live tomorrow, which is why they end up carrying the delay of everything else.

Write the deadline for each of these into the strip as its own row. A campaign that starts nine days late because nobody knew the artwork had to be certified is a cost, and it never appears in the cost column.

The money that arrives after the plan is approved

Media cost is the number everyone discusses. Put the rest in the plan from the beginning:

  • printing and mounting, and artwork adapted to each size
  • recording and voice fees, and certification of a film where it applies
  • property deposits, and electricity for a lit site
  • the tracking numbers and the landing page
  • the agency's own fee, and taxes written out as their own line

A plan without a production column always overruns, and the overrun arrives in the third week when nobody wants to stop.

Reach numbers, and how to keep them honest

Sellers will hand you audience estimates. Some are panel research, some are traffic counts multiplied by an assumption, and a few are invented. Do not put them in your plan as though you counted them.

Keep a separate column headed with the word claimed, record the figure and where it came from, and leave it there. Your own targets live in the judged-on column, and they are things you can count. Enquiries. Calls to a number only this line uses. Scans of a code only this panel carries. Walk-ins during the weeks it ran, read against the weeks before.

Then add a proof column. For every offline line, write down the evidence you will be sent: a dated photograph, a broadcast certificate, a copy of the page, a screen log. Agree it before booking, because proof of execution requested after the cycle is over rarely arrives.

Two rows that protect the whole plan

Hold about a tenth of the budget unallocated, in a row of its own, and write the date you will decide where it goes. That is the money that lets you extend the line that is working in week five instead of arguing for a new budget.

Then write the review dates into the plan itself. A technical review in week one, a cost review at week four, an honest review at the end. Naming the dates in the document is what stops the campaign from running to its end unread.

Media planning and buying is where we do this for clients, including the drive to look at the sites. The plan itself is not a secret, and a business that builds its own has a much better conversation with every seller afterwards.

What to do next

Take the last proposal you were sent and try to fill these columns from it. The columns you cannot fill are the questions to send back that afternoon: which panel, which edition, which weeks, what does production cost, and who is the person responsible.

Questions

Questions owners ask.

Is a media plan the same as a campaign brief?
No. The brief is the decision: the objective, the buyer, the offer, the geography and the money. The plan is the schedule that spends it, vehicle by vehicle, week by week. Write the brief first, because a plan built without one becomes a list of whatever the seller had available.
Should we build the plan or should the agency?
The agency builds it and you own the format. Give them your columns, including the one for what each line is judged on, and ask for the plan in a spreadsheet rather than a slide deck. A plan you cannot sort, filter or add a column to has been designed to be looked at rather than used.
How far ahead should a plan be made?
Physical media two months ahead, digital late. Hoardings, cinema weeks, press positions and metro sites go early in the festive run-up, and by Dasara the good ones are taken. Keep the digital rows unbooked until the fortnight before, when you can still change the creative.
Our budget is small. Is a plan this detailed worth the trouble?
It matters more on a small budget, because one wasted line is a larger share of it. A plan with six rows takes an afternoon. What it prevents is the fortnight where the flex is printed at the wrong size and the campaign starts nine days late.
What should we refuse to sign?
Any line that does not name the exact vehicle, any plan with no production column, and any schedule that starts before your tracking is tested. Also refuse a single bundled rate covering media and printing for several sites at once, because you can never tell afterwards which part of it moved.

From the blog

More notes for owners.

Get a free audit of how you sell, and a scored report of where the work is.

Book a free audit