Skip to content
← All articles

Notes for owners · Sales management

How to show the full cost of a flat without losing the enquiry

A price sheet layout that lists the base rate, the other charges and the likely total of a flat in one place, so the buyer does not have to unpick a low headline figure later.

The GullySales team · Updated 17 Oct 2026 · 6 min read

Editorial illustration for Sales collateral development
On this page
  1. Why does a low headline rate backfire?
  2. What goes on the sheet?
  3. A worked sheet, with figures made up for the purpose
  4. Two projects, one rate, two different flats
  5. How should the salesperson present it?
  6. When not to show everything at once
  7. Who owns the sheet

A price sheet that lists the base rate, every other charge and the likely total in one place gives the buyer less to unpick than a low headline figure. A buyer who finds the extras alone, at the sales office or in the agreement draft, may decide that everything else you told them is incomplete too. Showing the whole number early can cost you some enquiries. The trade is that you lose fewer buyers at the token stage.

Why does a low headline rate backfire?

Many buyers know there is a base rate per square foot and that it is not the final price. When an advertisement shows only the base rate, the buyer adds a guess for the rest and compares that guess with a rival's.

If your real total then comes out above their guess, the gap can feel like a trick, even when every item is legitimate. A buyer who feels tricked will tell the family, and the family is who decides.

What goes on the sheet?

Show every group of charges in a fixed order, with a short note on how each is worked out. The items differ by project and state, so treat this layout as a skeleton to fill with your own lines and check with your own adviser.

LineWhat to stateNote for the buyer
Base ratePer sq ft, and on which areaSay whether it is on carpet, built-up or super built-up area
Unit areaThe area you are multiplyingShow how it was arrived at
Floor, view or corner premiumIf any, per sq ft or lump sumTell the buyer which units carry it
ParkingIncluded, or priced separatelyOpen, covered, number of slots
Statutory charges and taxes that applyEach named, with the basisMark clearly which change with rules
Registration and stamp costsWhether they are in or out of your figureRules differ by state and change
Maintenance deposit, corpus and similarAmount or basis, and when payableSay what it covers
Utility connections and legal feesIf you charge themSay what the buyer pays you and what they pay others
Likely totalThe sum, with the date of the sheetSay it is an estimate until the agreement is signed

Add a footer: "Rates and charges are as of [date]. Government charges depend on rules in force at the time of registration." Keep the wording to what is true for your project, and check it with your adviser.

A worked sheet, with figures made up for the purpose

Take a two-bedroom flat in a mid-rise project in Gorakhpur. The figures below are illustrative only, to show how a sheet reads. They are not what any project charges.

LineIllustrative figure
Base rate ₹4,000 per sq ft on 1,000 sq ft₹40,00,000
Fifth-floor premium₹1,00,000
One covered parking slot₹2,00,000
Maintenance deposit and corpus₹1,50,000
Statutory charges and registration, in a separate block, set by rules in forcefilled from the current rules
Likely total before statutory charges and registration₹44,50,000, marked "estimate"

Written like this, the buyer sees what the builder keeps and what goes elsewhere, and where a number can move. Use your real figures on your own sheet, with your adviser's check.

A common mistake is printing only the first line on the hoarding and leaving the rest for the back page of the booking form. Put the all-in estimate on the sheet handed over at the first visit. Keep the base rate on the hoarding, with the words "base rate" beside it.

Two projects, one rate, two different flats

A buyer comparing your rate with a rival's is often comparing different areas. One project quotes on carpet area, another on super built-up area, and the same number per square foot buys a different flat. Write the area basis next to every rate you publish, and put your own total next to the rival's total when the buyer brings one. Do not run the rival down; do the sum with them.

How should the salesperson present it?

Walk the buyer down the sheet in order and stop at each line that surprises them. Do not skip the statutory block because it is awkward; that is the block they will ask about. If you do not know how a charge is worked out, say so and promise to confirm; do not guess.

Hand over the sheet only after you have asked which unit the buyer is considering. A sheet for the wrong unit starts the wrong argument. And give a printed or PDF copy with the date visible, so the buyer can compare it a week later against anything else they receive.

The site visit checklist for property sales teams shows where in the visit the sheet comes out.

When not to show everything at once

Not every enquiry needs the full sheet. A buyer who writes at midnight asking "price?" is helped by a clear range for the size they named, with a note that the sheet follows on request. Dumping a table of nine lines on a cold enquirer overloads them. Use the full sheet at the visit or when the buyer says they are comparing totals.

Do not show an "all-in" figure you cannot stand behind. If a government charge could change before registration, say "estimated" and say why. A confident figure that proves wrong costs more trust than an honest range would have.

Who owns the sheet

Name one person to own it. When the rate, a charge or unit availability changes, that person issues a new dated version and tells the team the same day. Collect the old copies. A salesperson quoting last season's sheet from memory is an easy way to start a price dispute.

Your first task: fill the nine-line table for one unit type with your real figures and have your adviser check the statutory lines. The real estate and construction hub has the rest of the sale around the sheet. To have a sheet built for your project, tell us what you need.

Questions

Questions owners ask.

Will showing all charges scare buyers away?
Some, at first. A buyer who leaves because of a total that was honestly shown may well have left later, after a visit and a token. The ones who stay have seen the number, which makes the loan and agreement stages less of a surprise.
Should the sheet include taxes and registration costs?
Show what applies to your project, with the basis, and say clearly which items you do not control. Rates and rules differ by state and change, so confirm each line with your own adviser before it goes on the sheet.
How often should the price sheet be updated?
Whenever the rate, a charge or an availability changes, and the old sheet should be withdrawn at once. Put a date on every sheet and make sure no salesperson keeps an older copy in their bag or on their phone.
What if a competitor advertises a lower headline price?
Do not match the headline. Show your total beside the question every buyer should ask any builder: what is added to this rate? Offer to go through both sheets with the buyer, line by line, if they bring the other one.

From the blog

More notes for owners.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.