A site visit and layout take days and some go nowhere
The engineer travels, measures and draws, and the buyer then uses the drawing to get a cheaper quote elsewhere.
Output to assess: Win-loss input record
Review whether “Win-loss input record” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring a completed opportunity record, its requirement and outcome, and the assumptions used to prioritise it.
Proposed completion check
Inspect a sample record against the original information. Check required fields, duplicate handling, the responsible owner, and who is permitted to access it.
