RFQs sit unanswered while the buyer moves to the next vendor
A drawing arrives by email while the quoting engineer is on the shop floor. The reply goes out four days later, with no tooling lead time stated. By then the buyer has already sent a sample order to a competitor who replied within a day.
Output to assess: Outreach and handover register
Review whether “Outreach and handover register” addresses this specific issue. Confirm that connection from the example before including the work in the scope.
What to bring
Bring a completed opportunity record, its requirement and outcome, and the assumptions used to prioritise it.
Proposed completion check
Walk the selected record through the proposed steps. Identify who acts at each handover, what information they receive, and how an exception is assigned without inventing a missing step.
