A press shop can quote a stamping or deep drawing enquiry the same day if its first reply asks for strip thickness, material, annual volume and tolerance, and says when the price will follow.
The GullySales team · Updated 17 Oct 2026 · 5 min read

On this page
The drawing lands at eleven in the morning: a pressed bracket, or a deep-drawn cup, and a purchase engineer who wants a rate by evening. You can, without guessing. Ask four things in your first reply: strip thickness, material grade, annual volume and the tolerances that matter. Send those questions early, say when the quote will follow, and price the moment the answers arrive. A rate sent at noon on assumptions you never wrote down is the rate you will be asked to hold for a year.
Why a press part cannot be priced from its outline
A machine shop's price moves a little with quantity. A press shop's tool changes completely. At a few hundred pieces a year, the bracket is laser-cut and bent on a press brake, or made on a simple single-stage tool. At fifty thousand it wants a progressive die, and the piece price falls while the tooling bill rises. Same drawing, two different quotations.
Thickness picks the press and the die clearance. The strip layout decides how much of the coil ends up as scrap skeleton, and on a pressed part material is a large share of the price. A tight hole position after bending can add a restrike station. None of this shows in the outline of the part, which is why a fast guess turns out expensive.
The four questions, and what each answer changes
- Strip or sheet thickness, with its tolerance. It sets press tonnage and die clearance. Ask whether the material comes as coil or sheets too, because the layout differs.
- Material grade and condition. CRCA in commercial, drawing or extra-deep-drawing quality, galvanised, stainless 304 or 430, or an aluminium temper. On a deep draw, the grade decides how many draws you need and whether the cup must be annealed between them.
- Annual volume, and quantity per delivery. This one chooses the tool: soft tool, single-stage, compound, progressive or transfer. Without it you cannot price the tool at all.
- The tolerances the buyer's inspection actually checks. Hole position relative to a bend, flatness, burr height and which side the burr may sit, wall thickness on a drawn cup. Most drawings carry a general tolerance block; ask which features are measured on every lot.
Where the drawing already answers one, do not ask it. A question the title block answers tells the engineer you did not read it.
The first reply, sent within the hour
Plain text, numbered, so the engineer can answer from a phone with "1. yes 2. DD 3. 24,000 4. holes 3 and 4":
Thank you for drawing BR-220, revision B. We can quote today. Four answers decide the price and the type of tool:
- Thickness: 1.5 mm nominal as drawn. What tolerance on thickness, and coil or sheet?
- Material: CRCA in which quality, commercial, drawing or extra-deep-drawing? Or galvanised?
- Quantity: how many a year, and how many per delivery?
- Inspection: which features do you measure on every lot? Any limit on burr height, or on which side the burr may sit?
If these reach us by (your cut-off time), the quotation reaches you by (your quotation time), with the tool and the piece price on separate lines.
The time line matters as much as the questions. It turns "we will revert" into something the buyer can plan around, so set times you know your estimator can keep. How to lay the tool and piece price side by side for a purchase committee is covered in what to put in an RFQ reply.
Can the estimator price it today?
Use one rule, and write it above the estimator's desk.
- All four answers in, and a similar tool built before: price today.
- More than one draw, a new progressive layout, or a tool room still to quote: send a budget range today, and name the day for the firm figure.
- Revision unclear, or a tool you can neither build nor buy: say so the same day. Decline, or ask for what is missing.
Same-day quoting is about the price, not the tool. State the tool lead time from the buyer's approval of the tool drawing, and keep it separate from the time to first samples.
For example: a kettle body enquiry in Jagadhri
Imagine a press shop in Jagadhri, Haryana, that has drawn steel utensils for years and has started taking job work. A small-appliance maker in Noida sends a drawing for an electric kettle body and asks for a rate by evening. The figures are illustrative.
The owner wanted the order and replied within an hour with a piece price, assuming SS 202 at 0.5 mm and a single draw, the way the shop makes tumblers every day. The drawing called for 304, and the body was taller than its diameter. The buyer accepted. At sampling the cups split on the first draw. The part needed a second draw station and an annealing step, and the tool cost roughly doubled. When the owner asked to revise the price, the buyer held the shop to the quote, and the next model's drawing went elsewhere.
On the next appliance enquiry, a 304 jar body at 30,000 a year, the four questions went out within the hour. The answers came back by two. By seven, the quotation named two draws with an anneal between them, the tool cost, and piece prices at 15,000 and 30,000 a year. It was higher than the kettle rate had been. It also held through sampling, though it cost the owner a closer look at the draw tooling.
When a rate within the hour is right
A repeat part on a tool you already hold needs the revision confirmed and the quantity, nothing else. Flat blanks and washers at stock thickness, asked for by a trader, can be priced on the spot. And when the buyer's RFQ pack answers all four questions, read it carefully and quote.
If the buyer will not share a yearly volume, quote two bands. Say that the tool differs between them. Sorting the enquiries worth that effort from the rate collectors, before the estimator spends an afternoon, is lead qualification.
Save the four questions before the next drawing
Fix your own two cut-off times, one for the buyer's answers and one for your quotation, and put them in the reply above. Send it with the next drawing. See whether the quote survives sampling unchanged. The rest of the press shop's selling job is on the forging and metal forming page. If you want the reply routine and the quotation format set up together through lead response, tell us what you need.