Skip to content
GullySales

AAC block manufacturers · Social media

Show the wall being built, so a mason trusts a block they have not laid.

Social media marketing for an AAC plant means posting the plant, the wall and the people who lay it where builders and masons already look. GullySales works on what to film, which accounts matter and how a comment becomes a recorded enquiry.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

A builder and supervisor inspect paving blocks in a materials yard

What social media means

Social media is the ongoing posting your business does on platforms such as Instagram, Facebook and LinkedIn to stay visible to customers and prospects between purchases. GullySales plans a posting calendar, writes captions and designs the images so the page looks active and answers what a visitor would ask.

Last updated 14 Nov 2026.

For AAC block manufacturers

Where it usually goes wrong, and what we would do.

  • “A mason believes what they see laid, not what is claimed”

    A short clip of a wall going up with thin-bed adhesive answers the unspoken question: is this hard to do. A rate sheet cannot do that, and a clip on a phone can.

  • “The plant itself is content a competitor cannot copy”

    Autoclaves, stacked pallets, cutting and the loading yard show scale and process. A buyer who sees the batch being made starts to judge consistency before ever asking for a sample.

  • “Project sites are your best story, with permission”

    A finished building made with your blocks tells a developer more than a slogan. Always ask the builder first, and leave out any site, family or worker who has not agreed to appear.

What we do

What we deliver for AAC block manufacturers.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. A content plan around site and plant

    A list of shots to take on each visit: the laying, the adhesive, the plaster, the stacked blocks and the truck leaving.

    Result: Your sales engineers know what to film when they are already on site.

  2. Short mason guide videos

    Clips in the local language showing cutting, chasing and fixing, using your trainers and your own blocks.

    Result: Each clip answers one question a mason asks.

  3. Profiles for builders and contractors

    Pages on the platforms your buyers use, described with the same address, name and contact as your website.

    Result: A builder checking you on a phone finds the same plant everywhere.

  4. A comment and message routine

    Who replies, how the message is logged and where the enquiry is recorded when a viewer asks for a rate.

    Result: No reply is lost between a platform and your sales sheet.

  5. A platform review in plain words

    Which posts brought project enquiries and which only brought views, set against the figures recorded at the start.

    Result: You can drop what does not bring buyers.

How the result is measured

  • Posts published
  • Engagement rate
  • Enquiries from social profiles

Recorded as a baseline before work starts, so every later report has an honest comparison.

Posts and pieces to plan

Plant and site posts that let a mason see the wall being built.

First course on a new site
A short video of the first block course set in adhesive, with the level and the mortar thickness visible. Needs the mason's and the builder's consent.
Cutting and chasing AAC
A clip of cutting a block with a hand saw and chasing for a conduit. It answers a mason's main fear, that the material cannot be worked.
Autoclave and curing at the plant
A photograph set from the plant floor showing the cutting wire and the autoclave door, captioned in plain words without technical claims.
Wall finished and plastered
A before and after of a real wall with the finishing method named. Written permission from the owner is required before posting an address.
Dealer delivery arriving
A post with the truck and the dealer's name, tagged with consent, which tells local builders that stock is available nearby.

Who it is for

This is written for these AAC block manufacturers.

  • Large AAC plants selling across districts and states
  • Regional units supplying a few cities
  • Makers who also sell jointing adhesive and plaster
  • Manufacturers with technical teams who train masons on site
  • Manufacturers selling through building material dealers
  • Suppliers focused on apartment and commercial developers
  • Producers selling to individual house builders through architects
  • Newer entrants in towns where brick is still the habit

Before you decide

When this may not be the right fit.

  • You have no plant footage or site visits to film, and posts built from stock images will not persuade a mason who believes only what is laid.
  • Your dealers do not agree to be named, so the delivery posts that bring local builders have no one to tag.
  • No one is assigned to reply to comments and messages, and a builder who asks for a rate on a post expects an answer.

Before you decide

Agree the work. Know how to judge it.

Social media marketing for AAC block manufacturers: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

Review the posts that produced useful conversations, not only the ones with the most views. Gather buyer questions and decide which team member can contribute credible material.

Make the scope clear

Choose the audience and channel before setting a posting volume. Agree who supplies material, approves posts, and handles messages, including complaints or questions the agency cannot answer.

Check the work in use

Follow a post through to the profile, website, and response. A useful report explains the quality of conversations and enquiries, alongside reach and engagement.

Know when to change course

If publishing takes time away from unanswered buyer messages, fix the response routine first. Do not expand to another channel without a clear reason for being there.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from AAC block manufacturers. Anything missing is noted in the written scope, with who will supply it.

Admin access to the plant's profiles
We draft and schedule posts and read the platform's own figures, which need admin or editor roles. Bring the logins or add us as a role. Without access you post by hand from our drafts, and linking enquiries to posts is less exact. A guest login does not allow scheduling.
A phone and someone who can film
Plant and site footage needs a steady phone and a person willing to hold it. Choose who. If nobody can film, the plan relies on still photographs and posts reach fewer masons. A clean lens matters more than the make.
A fitter who can show the work on camera
Mason guide videos need a trained person who lays blocks well and speaks plainly. Name the person and ask them. Without a fitter, videos show only the plant and say little to the people who build. Gloves and a helmet are enough as a costume.
Written permission from builders where it exists
If any builder has agreed to a site being shown, bring the message that says so. Without a record the site is treated as private. The permission note depends on this and protects the plant and the builder. Keep these in a folder named by builder.
One owner for comments and messages
Builders ask direct questions under a post. Name who replies and how a question becomes an enquiry. If nobody is named, comments pile up unanswered, which looks worse than posting less.

How it works

How the social media work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Walk the plant with a phone in hand

    We spend a visit at the plant, or look through your phone gallery, to see what is already filmable: the cutting wire, the autoclave doors opening, blocks stacked on the yard, a truck loading. You point out what is safe and what belongs to a customer or a competitor's gaze. We note each moment on a short list the fitter can use.

  2. 2

    Agree what may be shown from client sites

    A wall being laid on a builder's site is your best story, with permission. We write a short note on what may be shown, how a site is described without a name and who confirms it. Anything beyond that note is left out of the plan. The note is signed off by you before it is used.

  3. 3

    Choose accounts that builders and masons follow

    You tell us where builders, contractors and masons already look, and we pick the platforms that match and drop those you cannot keep up. We also list the pages and groups to follow, so the plant is seen as part of the local building trade. A platform with no capacity behind it is left alone.

  4. 4

    Plan short mason guide videos with a fitter

    With a trained fitter, we list the jobs worth filming: laying the first course, applying adhesive, cutting for a pipe, fixing a wall hanging. Each video has one lesson. You approve the script before filming and check the result before it is posted. Ideas that need special equipment are dropped.

  5. 5

    Write captions and set the reply routine

    We write captions in plain language, in the language masons use where that helps, and set out who answers comments and messages. A comment that asks for a rate is recorded as an enquiry, with the post it followed, in the same sheet as the starting figures. The person who replies is told which questions go to the technical head.

  6. 6

    Read posts against the project enquiries

    We compare enquiries and calls that followed posts with the figures noted at the start. You see which posts brought builders with a site and which brought only praise, and decide which kinds of video to repeat. The log is a sheet any executive can keep.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 0, foundation. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Which platform should an AAC plant use first?
Start where your buyers already are. Builders and contractors in India watch short video and messaging apps, while architects and engineers use a professional network. We check this against your own enquiries before choosing.
Can we post a customer's building?
Only after the owner or builder has agreed, and not showing private homes or people without their consent. Check the platform's current rules about advertising and tagging before you post.
Do we need a full-time person for this?
Not at the start. A sales engineer with a phone, a plan for shots and one person who edits is enough to begin. Add effort when the posts begin to bring enquiries you can trace.
How should we show a site where the builder wants privacy?
Show the wall and the work without the address or the owner's name, and keep the permission in writing. A builder sells flats on a site and may not want a block maker named. A cropped photograph of the wall still shows the mason how AAC sits.
Is the plant itself enough to post about?
It is a good start because a competitor cannot copy your yard, your cutting line or your dispatch. A mason or builder who sees a clean, busy plant draws conclusions about reliability. But plant footage alone does not teach anyone to lay a block. We mix it with short site guides, so the plant earns trust and the guides earn the mason's attention. We keep the two kinds of post apart in the plan.
How should we answer a comment that attacks AAC as a material?
Answer politely, with a fact you can document, and do not argue. If a mason says AAC cracks, ask where and how it was fitted, and offer the guide on joint adhesive. Others read the reply and judge the plant by its tone. We write a few model replies with your technical head, and mark which questions to take to a private message. Do not delete a fair comment from a mason.
How much does it cost?
There is no price list, because the work differs by business. The fee is scoped after we have read your brief and spoken to you, and put in writing before anything starts, split into our time, your media spend and production.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.