Skip to content
GullySales

Industrial repair and maintenance companies · CRM

Know which plant owns which machine and when its next service is due.

A CRM for an industrial repair company is one record of every plant, machine, job card, quotation and AMC date, so nothing depends on one person's memory. It replaces diaries, WhatsApp scrolling and loose job cards. GullySales sets up the fields, the follow-up dates and the reports, and trains your team to use them.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Maintenance technicians inspect a disconnected industrial motor

Last updated 14 Nov 2026.

For industrial repair and maintenance companies

Where it usually goes wrong, and what we would do.

  • “Job cards live in a drawer”

    Paper job cards hold the history of each machine, but nobody can search them when a plant calls about a repeat fault.

  • “The plant has several contacts”

    The maintenance head calls, the purchase officer approves and the accounts team pays, and the record shows only one of them.

  • “AMC dates sit in a diary”

    A diary entry for a contract ends when the person who wrote it leaves, so the renewal is lost with that person.

What we do

What we deliver for industrial repair and maintenance companies.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Plant and machine records

    A record per plant listing machines, makes, serial numbers, locations and contacts, so a returning fault is linked to its past repairs.

    Result: A technician sees the history before reaching the plant.

  2. Job card and quotation log

    Each job card and quotation entered with date, value, status and the person responsible, in the format your plant customers already use.

    Result: Quotes are tracked to a win or a loss.

  3. AMC calendar with renewal alerts

    Contract start and end dates, visit dates and the person who calls before each expiry, with a reminder that does not depend on a diary.

    Result: Renewals are followed up before the date, not after.

  4. Follow-up tasks for every open quote

    A task and a due date on each open quotation, assigned to a named person, with a note field for what the plant said.

    Result: A quote does not age in silence.

  5. Team training on a few habits

    A short session on the three entries every technician and coordinator must make, with a check against real job cards.

    Result: The record reflects the work, not only what the owner remembers.

How the result is measured

  • Enquiries logged in the CRM
  • Data completeness
  • Reports generated from CRM data

Recorded as a baseline before work starts, so every later report has an honest comparison.

What to record, and when

Record these six things for every plant, from the first call to the renewal.

Plant, contact and role
At the first call, note the plant, the person, the role and a second contact such as the purchase officer. Add the machine, make and nameplate serial number at the first visit.
Fault, work done and parts used
Write what you found and replaced on the job card and copy it to the record. The next technician and the quotation team both need this.
Quotation value, date and next follow-up
Enter the amount, the date sent and a call date. A quote with no call date is a quote that will be forgotten.
Outcome and reason
Record won, lost or waiting, and why. A lost job because of a lower price from a nearby workshop tells you something different from a delayed purchase order.
AMC start, end and visit dates
Enter all three, and set a call at least a few weeks before the end date. The call is the renewal conversation.
Do you need software yet?
If you have fewer than a few dozen plants and one coordinator, a shared sheet with fixed columns is enough. Move when two people need the same record at the same time.

Who it is for

This is written for these industrial repair and maintenance companies.

  • Electric motor rewinding and repair shops
  • Pump, gearbox and compressor overhaul workshops
  • Hydraulic and pneumatic repair companies
  • CNC and machine tool service companies
  • Electrical panel, drive and automation service teams
  • Diesel generator and transformer maintenance firms
  • Crane, hoist and material-handling service companies
  • Shutdown and plant maintenance contractors

Before you decide

When this may not be the right fit.

  • Your jobs fit a register one clerk keeps well, and a system would only add typing for no new insight.
  • Nobody will fill a job card after a visit, so a CRM would hold only what the owner remembers.
  • You have no stable list of plants and machines, so there is nothing to build the records around yet.

Before you decide

Agree the work. Know how to judge it.

CRM for industrial repair and maintenance companies: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

List the records your team uses and show how an enquiry becomes an order today. Bring examples of duplicate entries, missing owners, and reports that require manual correction.

Make the scope clear

Agree the stages, required fields, access roles, and integrations before configuring the system. Separate software subscriptions from setup, data work, and training.

Check the work in use

Ask the people who will use the CRM to complete a real handover and find the next action without help. Check that the management report can be traced back to individual records.

Know when to change course

If the process is unclear, buying a more complex CRM adds more places for confusion. Start with the minimum fields and rules the team can use consistently.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from industrial repair and maintenance companies. Anything missing is noted in the written scope, with who will supply it.

The job card drawer, in some order
Bring the cards for open quotes, current AMC plants and the last busy stretch, even if loosely sorted. These are what we load. Without them the system opens empty and the team returns to the diary. Cards with pencilled notes about parts or promises are especially useful, because the system should carry those notes forward.
The AMC diary with end dates
Hand over the diary or sheet that holds the contract dates and visit schedules. The renewal alerts depend on it. If dates are missing, tell us which plants to ask, because a wrong date sends a false alert.
A list of plant contacts by role
For each plant list the maintenance head, the purchase officer and the accounts contact where you know them. The sales effort differs by role. Where only a number exists, we load it and mark the role as unknown. The roles shape who receives which reminder, so a purchase officer is not sent a technical visit alert.
One person who owns the system
Name the office person who keeps records right and answers the team's questions. A system with no owner decays in weeks. If nobody is free, we start with fewer fields.
A decision on who may see prices
Settle which staff can see quotation values and margins. Technicians seldom need both. We set access to match, so the system does not leak your rates. Staff who handle only breakdowns can be kept away from contract values altogether.

How it works

How the CRM work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Trace a job from call to payment

    We follow one recent job through your files with the person who handled it: the call, the pickup, the job card, the quotation, the repair, the invoice and the follow-up. You mark where paper or memory was the only record. That marked trail becomes the stages the system will show. The trail also shows which person holds each piece of knowledge, so the move to a system does not depend on whoever remembers best.

  2. 2

    Shape the plant and machine records

    We decide with you what each plant record holds: contacts by role, the machines you have repaired for them, the AMC status and the last job. Where a plant has several units, we agree how to separate them. You approve the fields before anything is typed in.

  3. 3

    Load a few plants into a test copy

    We enter a small group of live plants into a test copy and ask the office to work a day's calls and quotes in it, without touching the real system. You note what is awkward. We change the screens until the office finds them quicker than the diary. The office person who will own the system takes part, so the test also shows what that person needs to learn.

  4. 4

    Move job cards and AMC dates across

    With the office we transfer open quotes, current AMC contracts and their end dates from the diary and drawer. Each AMC date gets an owner. We check a sample of records against the paper to catch mistakes before the old files are put away.

  5. 5

    Run a working session with the technicians

    Technicians learn to close a job card and note the machine, the fault and the next visit from a phone. We teach only the few habits that matter. You see who struggles and agree where the office will enter on their behalf.

  6. 6

    Hand over the data and set the review

    You receive the logins, the export of all records and a note on who owns the data. We then compare the open quotes chased and AMC renewals noticed against the diary record from before. Adjusting the stages after the review is up to you.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales management. A target, a review routine and someone who owns the number.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3 · you are here

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Is a spreadsheet enough for us?
For a small team with few plants, yes, if everyone fills the same columns. It breaks when two people edit it or when follow-up dates need reminders. Move to a CRM when quotes are being lost between people.
Our technicians will not update anything. What then?
Make the entry short: plant, machine, what was done and the next date. Let them send it by WhatsApp to a coordinator who enters it. Tie follow-ups to the record, so the entry visibly brings in work.
Can we record WhatsApp conversations?
Save the key details to the plant record, such as the fault, the quotation and the decision. Copying whole chats makes the record unreadable. Ask contacts before you store or share their messages.
Who owns the data if we change CRM?
You do. Choose a system that exports your plants, machines, jobs and notes in a standard format. Ask for that in writing before you sign, and keep a copy yourself.
Can the CRM connect to our accounting software?
It can be linked through an export or a connector, but we ask first whether the link is needed. For a repair company the first gain comes from plant records, open quotes and AMC dates, not from invoice data. If your accountant wants invoice numbers beside the job record, we agree a simple method such as a reference field the office fills when the job is billed, and add a connection later if the volume justifies it.
Do technicians need their own logins?
They need access only if they will enter or read records. A workshop can start with the office entering for the technicians and a phone view for the few who attend plants. Each person who logs in has their own login, so the record shows who changed what. If a technician only reads the day's list, we set a read-only view that hides prices and contact details outside their jobs.
How much does it cost?
There is no price list, because the work differs by business. The fee is scoped after we have read your brief and spoken to you, and put in writing before anything starts, split into our time, your media spend and production.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.