Skip to content
GullySales

Material handling equipment manufacturers · Website

Build a site that shows the load, the span and the sites you have served.

A website for a material handling maker is the place where a plant engineer checks whether you build the equipment, at the load and span they need, and whether you have served a site like theirs. GullySales plans the pages, the specification tables and the enquiry form around that check.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

Material Handling product collection

What website means

A website is the page a customer lands on after searching, clicking an advert or scanning a code, and it decides whether they call or leave. GullySales builds and maintains sites that load quickly, explain the offer plainly and make the enquiry form or phone number easy to find.

Last updated 14 Nov 2026.

For material handling equipment manufacturers

Where it usually goes wrong, and what we would do.

  • “A product list is not a proof of capability”

    A grid of photographs does not tell a warehouse manager whether the stacker fits the aisle. Pages with load, lift height, span and the type of site served answer the question the buyer came to settle.

  • “The phone is where the enquiry starts”

    A stores head looks up a maker while standing in the bay. Pages that load slowly or force a pinch-zoom lose that buyer. A layout built for the phone, with a call button and a form that accepts a photograph, wins the visit.

  • “References are hard to find on industrial sites”

    Buyers want to see where the equipment works. A references page by sector and equipment, with consent from each customer, saves a salesperson from repeating the same list on every call.

  • “The form asks too much or too little”

    A form asking only for a name gives the engineer nothing to prepare. One with twenty fields is abandoned. A short form with load, lift height and site type is enough to begin a useful conversation.

What we do

What we deliver for material handling equipment manufacturers.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Equipment pages

    A page for each product line with a specification table, drawing and photographs of installations.

    Result: A buyer can judge fit from the page.

  2. References page

    A listing of sites served by sector and equipment type, shown with customer permission.

    Result: A new buyer sees work like their own.

  3. Phone-first layout

    Pages designed for a small screen, with a call button and a photograph upload on the form.

    Result: An enquiry can be sent from the bay.

  4. Enquiry form

    A short form asking for equipment, load, lift height, location and contact.

    Result: Each enquiry gives the engineer something to prepare from.

  5. Service and inspection section

    Pages on upkeep, annual maintenance and the process your service team follows, checked by a competent person.

    Result: The site shows what follows after the sale.

How the result is measured

  • Page load time
  • Bounce rate
  • Enquiries from the website

Recorded as a baseline before work starts, so every later report has an honest comparison.

Searches your buyers type

The site has to answer these questions on the first screen of a phone.

eot crane 10 ton specification
A product page with capacity, span, lift, class and a drawing. The engineer reads this before calling.
material handling equipment manufacturer reference sites
A references page with sites, equipment and permission. Buyers of capital equipment ask for proof first.
crane manufacturer contact number
A prominent call button and a form. Plant engineers will phone before reading anything.
crane installation and commissioning process
A page that explains what happens after the order. It reassures the buyer who has never bought a crane.
annual maintenance contract for cranes
A service section with what the visit covers. It shows the maker stays after the sale.

Who it is for

This is written for these material handling equipment manufacturers.

  • EOT crane, gantry and jib crane makers
  • Hoist and winch makers
  • Stacker, pallet truck and trolley manufacturers
  • Conveyor and roller track makers for factory lines
  • Racking, platform and storage equipment makers
  • Forklift attachment and special lifting tackle makers
  • Dock leveller, lift table and tail-lift makers
  • Makers who combine new supply with crane inspection and AMC

Before you decide

When this may not be the right fit.

  • You have no photographs of installed equipment or permission to name sites, so the references page would be empty.
  • The product range is still changing and the datasheets are not final, which would lead to rewrites.
  • Your enquiry form goes to an inbox nobody checks, and that must be fixed before building more pages.

Before you decide

Agree the work. Know how to judge it.

Websites for material handling equipment makers: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

List the pages that support a buying decision and the actions visitors must complete. Keep examples of failed forms, unclear product information, and questions your team answers repeatedly.

Make the scope clear

Agree the page list, content ownership, integrations, and who controls the domain and hosting. Include redirects and existing search traffic in a redesign brief, before changing addresses.

Check the work in use

Complete a real enquiry journey on a phone and a laptop. Check that the confirmation appears, the enquiry reaches the right person, and tracking records the action once.

Know when to change course

If visitors can enquire but the team does not follow up, start with the sales handover. A larger website will not resolve that delay.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from material handling equipment manufacturers. Anything missing is noted in the written scope, with who will supply it.

Domain and hosting control
Registrar and hosting logins held in your name, with a second person who can recover them. Where a former vendor holds them, we need their cooperation to move the domain, and the launch date waits for it. If the domain is in an employee's personal name, change it to the company before the build starts.
A reference list with permissions
Customers and sites that allow naming, with the equipment supplied. A list with consent notes will do. Without it pages describe sites without names. Customers who prefer anonymity can still appear as a described site, such as a cold store in the region, if they agree to the description. Please add the equipment each customer received.
Photographs of installed equipment
Clear pictures showing the machine in its bay. Phone photographs are acceptable. Without them pages rely on drawings. Each picture should show the load and the bay in one frame, with no people standing under a suspended load, and a note of the model and rated capacity beside it.
Safety standards you can truthfully cite
The codes and tests your equipment meets, as the works records them. A list is enough. Without it the safety section is silent on standards. Certificates, test reports and the name of the inspecting body are the evidence behind each line, so keep copies ready for your engineer to check.
The questions you want the form to ask
Load, span, site and timing needs, short enough to answer on a phone. A list will do. Without it the form asks only for contact and equipment. A buyer on a phone will not fill a long form, so choose the four or five answers your sales engineer needs before a first call.

How it works

How the website work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    List the equipment and loads the site must prove

    With your works head we set out what a plant engineer must be able to check on the site: the equipment types, the load and span ranges, the sites served and the service offered. You decide what is stated. What exists afterwards is a content list that the page structure follows. Any claim that depends on a certificate is marked so it is checked before it is published.

  2. 2

    Take logins and gather the references

    We collect domain and hosting access, brochures, photographs and the reference list, and ask which customers allow their name. You decide what is shown. Afterwards we hold everything needed to build and a note of what is missing. Photographs are sorted by equipment type so each page can be built from the right set.

  3. 3

    Approve the sitemap with phone-first layouts

    We show the structure and the layout on a phone screen first, since the enquiry begins there for the plant engineers who find you, and you approve it before design starts. Changes are cheap at this stage and costly after the build, so your works head reads the equipment page layout for the load and span fields. Afterwards the sitemap and the phone layouts are fixed in writing.

  4. 4

    Review equipment pages with the designer

    On a test site, your designer reads each equipment page and the specification tables against the drawings and corrects them. Afterwards no figure stands that the works has not confirmed. Any figure in doubt is removed until confirmed.

  5. 5

    Approve the launch and the redirects

    You give the final approval and we switch the site, set redirects from old addresses and test the call button and the form on phones. Afterwards old links reach the new pages. Your sales head receives the first form test message.

  6. 6

    Check live forms and read first enquiries

    After launch, we hand over every login and sit with your sales head to read early enquiries against the figures from the old site. You decide changes. We report what the record shows and promise no volume.

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 1, prospecting and lead generation. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Should the site publish prices?
For made-to-order equipment, no. Publish what the price depends on, such as load, span and duty, and invite the buyer to send the figures. Your team decides what, if anything, to show.
Can the present site be kept and improved?
Yes, where the structure allows it. We review the pages, the speed on a phone and the form, then propose which parts to keep and which to rebuild.
What does an industrial buyer look for first on a site?
The equipment, the capacity range and a reference they can check. A buyer in a hurry on a phone wants a call button and a datasheet. Put those above any story about the company, and keep the form short.
How do we handle the safety standards on the site?
Name the standards your equipment is built to only where you can prove it, and keep any certificate current. Statutory rules for lifting equipment differ by state, so tell buyers to check their own requirements with a competent person.
Should the site show a price list?
For made-to-order equipment, no, since price depends on load, span, site and duty and a printed number misleads. Publish what drives the price instead, so the buyer can judge whether a quotation is near. A standard item with a fixed specification can carry a starting price if you can stand by it. We discuss each line with you and let you decide.
How do we handle safety standards on the site?
Name a standard only when your works builds and tests to it and holds the certificate, and state the scope exactly. A claim of compliance that the buyer's inspector cannot verify harms trust. We take the list from your records, your engineer confirms each entry, and we link certificates where you allow. Where a standard depends on the customer's site, say so on the page.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.
What do you need from us?
Your brief, and a conversation. After that, access to whatever this work touches, such as your website, your accounts or your enquiry record, and time with the people who handle your enquiries.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.