Skip to content
GullySales

Industrial equipment manufacturers · CPQ consulting

Quote a configured machine from written rules, not from the last similar quotation.

CPQ consulting for an industrial equipment maker means writing down which motors, drives, tooling and accessories can sit on which machine, what each combination costs, and who approves an exception. GullySales turns those rules into a spreadsheet or a CPQ tool and links the quote to your CRM and order entry.

Scope, fee, reporting and term are agreed in writing after we have read your brief and spoken to you.

A sales engineer and consultant compare pump options with a pricing spreadsheet

What CPQ consulting means

Configure, price and quote (CPQ) means rules that decide which options can be sold together, what each combination costs, and who approves the exception. GullySales writes those rules down, builds them in a spreadsheet or a CPQ tool, and connects the quote to your CRM and order entry.

Last updated 14 Nov 2026.

For industrial equipment manufacturers

Where it usually goes wrong, and what we would do.

  • “The quote starts from a similar machine someone remembers”

    A salesperson opens the last quotation for a comparable press or pump, edits the capacity, swaps a motor and sends it. Whether that motor suits that frame, or whether a guard is now missing, depends on memory. The error surfaces at the plant, after the order.

  • “Option compatibility lives in one engineer's head”

    Which control panel fits which drive, which feeder cannot sit beside which hopper, which voltage needs a different starter: the answers sit with a single design engineer. Every quote waits for that person, and the sales team guesses when that person is on the shop floor.

  • “The buyer compares three quotations with different scopes”

    A procurement engineer lays three offers side by side and finds one includes installation and spares while another leaves them out. A manufacturer whose quote does not state its scope line by line looks either dearer or careless, and neither wins the order.

  • “Dealer and direct prices drift apart”

    A dealer holds one price list and the factory sales desk holds another, each edited in its own file. When the same machine is offered to the same plant through both routes at different rates, the buyer notices and the manufacturer explains.

What we do

What we deliver for industrial equipment manufacturers.

The work available for this need. We agree the deliverables and responsibilities for your engagement in writing.

  1. Machine and option rules document

    A written list of every model, its optional parts, the options that require others, the combinations that are refused and the parts added automatically. Your design lead signs it before any build starts.

    Result: Any quote can be checked against one signed document.

  2. Price list structure for direct and dealer sales

    One structure for base machine prices, option prices, quantity breaks and dealer levels, each with an owner and an effective date. Older lists are retired instead of left open beside the new one.

    Result: The same machine carries the same rate whichever desk quotes it.

  3. Discount and exception approval matrix

    A table of who may approve a discount, a non-standard fitting or a changed delivery scope, and what the salesperson tells the buyer while waiting. Your owner sets the limits; GullySales builds the routing.

    Result: Each approved exception has a name against it.

  4. Scope-stated quote template

    A quotation layout that lists machine, options, installation, commissioning, spares and warranty as separate lines, with GST shown apart and validity stated. The tax and legal wording goes to your adviser for review.

    Result: A buyer can see exactly what is and is not included.

  5. Rebuild test against past quotations

    Selected earlier quotes, including a lost one and an awkward one, rebuilt in the new set-up and compared line by line. Differences are either a build error or an unwritten rule, and both get recorded.

    Result: The team sees the old and new totals for the same machine.

  6. Handoff to CRM and order entry

    The agreed route for an accepted quote to reach the CRM and your accounts system without retyping the configuration, with the quote number carried across.

    Result: An order can be traced back to the quote that created it.

How the result is measured

  • Corrections made after a quote is sent
  • Approvals requested, and the rule that triggered each
  • Time from complete enquiry to approved quote

Recorded as a baseline before work starts, so every later report has an honest comparison.

Who it is for

This is written for these industrial equipment manufacturers.

  • CNC machine and precision equipment manufacturers
  • Industrial pump and compressor manufacturers
  • Packaging machinery manufacturers
  • Conveyor and material handling equipment makers
  • Motor and drive manufacturers
  • Custom fabrication and job-work manufacturers
  • Export-oriented industrial equipment makers
  • Spare parts and after-sales service providers

Before you decide

Agree the work. Know how to judge it.

CPQ consulting for industrial equipment manufacturers: use these checks to prepare, choose the scope, and review what changes.

Bring the right evidence

List the records your team uses and show how an enquiry becomes an order today. Bring examples of duplicate entries, missing owners, and reports that require manual correction.

Make the scope clear

Agree the stages, required fields, access roles, and integrations before configuring the system. Separate software subscriptions from setup, data work, and training.

Check the work in use

Ask the people who will use the CRM to complete a real handover and find the next action without help. Check that the management report can be traced back to individual records.

Know when to change course

If the process is unclear, buying a more complex CRM adds more places for confusion. Start with the minimum fields and rules the team can use consistently.

These are discussion points, not a fixed package. GullySales confirms the deliverables, responsibilities, fee, and term in writing after reading your brief and speaking with you.

Before we start

What to have ready before the work starts.

The records, access and decisions this work needs from industrial equipment manufacturers. Anything missing is noted in the written scope, with who will supply it.

Six past quotations, simple and complex
The rebuild test uses real quotations. Bring a mix, including one that was revised several times and one that was lost, because the lost quotation shows the option the buyer did not want. Without them, the rules are untested against real cases. Without them, the sheet cannot be tried on real cases.
A design head to state compatibility
Which options fit which machine is design knowledge. The design head must give time to write and check the rules. If not, rules are drafted by the estimating engineer and marked as unconfirmed.
The current price lists
Bring the lists as used: direct, dealer and spares. If several exist, say which is current. We do not set prices, so a list with errors will give errors in the quote.
A rule for discounts and exceptions
The owner must state who may approve what. Without it, the matrix records the owner's decision on every case. Bring examples of past exceptions to guide the rule.
A person who will maintain the tool
Prices and options change. Someone must update the sheet or tool when they do. Name that person and a stand-in. A price list that is not updated when a supplier raises a motor price will give wrong quotes without anybody noticing. If nobody can keep it, we advise a plain sheet that the sales coordinator can maintain.

How it works

How the CPQ consulting work runs

The work itself, in order. How an engagement starts, from your brief to a written scope, is set out on our method page.

  1. 1

    Follow one quotation from request to approval

    We sit with your estimating engineer and follow the last quotation for a machine from the buyer's request to the signed offer. We note which files are opened, who is asked, what is copied from an earlier machine and where the price comes from. This shows how the rules actually live in people's heads. We ask the estimator to say aloud why each option was chosen, and we write down every reason that starts with a remembered machine, since those are the rules that have never been written.

  2. 2

    Write the machine and option rules

    With your design head we write which motors, drives, tooling and accessories can fit each machine, which combinations are barred and which need a design check. Each rule is a sentence an estimator can read. Rules the design head cannot state are marked for a decision, and the document lists which combinations have never been built, so nobody quotes one by accident. The finished document is short enough for a new estimator to read in an afternoon.

  3. 3

    Set the price structure and approval limits

    You settle the structure of the price list for direct and dealer sales, and the discount and exception limits. We do not choose prices. We lay out the structure in a form that shows base machine, options and charges separately, so the buyer comparing three quotations sees the same scope lines in each. The owner signs the approval matrix, and the dealer prices are derived from the direct ones by a stated rule, so the two never drift apart.

  4. 4

    Choose between a sheet and a tool

    Based on the number of machines, options and quoters, we recommend a spreadsheet or a CPQ tool, with the cost and the upkeep of each. You choose. A smaller business may be better served by a well-built sheet that two people understand than by a tool nobody maintains.

  5. 5

    Build it and test against past quotations

    We build the sheet or tool and run six of your past quotations through it. Where the output differs from what was sent, we find out why: a rule missing, a price outdated or an estimator's judgement. Differences that came from judgement are discussed with the estimator, because they are either a hidden rule to be written or an error that was sent to a buyer. Your estimating engineer corrects the rules until the test cases match.

  6. 6

    Connect the quote to the CRM and order entry

    We link the finished quotation to the buyer's record in your CRM and to the order entry sheet, so the specification does not have to be typed again. The scope statement on the quotation lists what is included and what is not. Your team uses it on live quotations while we watch. We check that a revised quotation keeps its number and shows what changed, so that a buyer can see what the revision did to the scope, and that order entry receives the same options the buyer was quoted.

Proof

Published examples of our work.

Real clients and the work recorded for each engagement. These examples may cover related services or industries. They show the method, not a guaranteed result.

All case studies
  • Burhani Hydroline

    Situation
    The website was dated. Menus were hard to follow, pages were slow, and it did not work properly on a phone, which is where a buyer looks first.
    What we did
    • Research before design
    • Wireframes and prototypes
    • The full product catalogue
    • An online checkout
    Result
    No numbers were recorded for this engagement. The work is described in full in the case study.
    Read the case study

Also worked with

Chord Road Hospital · Curtain Label · Difesa Security Services · Felicity Inn · Hands On CSR · Implevista · Kambar Group · Kalessi · Kerur Pain Clinic · LL Trust · Lucky Deals · Natural Gases · NavaShakthi Souhardha · NewCom Logistics · Proton Technical Services · SB Engineering · Shakthi Foundation · Shakthi Group · Urbanest · Insyde Studio · Venkateshwara Laser Tech · Vivara Studios

Where this fits

Three pieces of sales work, in this order.

This work sits inside sales process design, at stage 1, prospecting and lead generation. The audit comes before it, and sales management keeps it running.

  1. Step 1

    Sales audit

    Find where deals are being lost and what to fix first.

    Start here if you cannot say where orders are lost.

  2. Step 2 · you are here

    Sales process design

    One written way to sell, from first enquiry to repeat order.

    Start here if every salesperson sells differently.

  3. Step 3

    Sales management

    A target, a review routine and someone who owns the number.

    Start here if the team has targets and no routine.

Tell us what you need Your brief is read before we call. Scope, fee and term in writing.

FAQ

Questions owners ask before they call.

Not here? More answers, or ask on WhatsApp.

Do we need a CPQ tool, or will a spreadsheet do?
It depends on the number of models and options you carry and the number of people who quote. GullySales sets the spreadsheet route and the tool route against your written rules, and you choose. If a tool is chosen, read the vendor terms and exit conditions first.
Who decides our prices and discount limits?
Your owner or commercial head. GullySales records those decisions in the rules and the approval matrix, and builds them in, but does not set prices for you.
Our machines are mostly one-off builds. Can rules still work?
Yes, for the parts that repeat, such as drives, panels, guards and service kits. A truly custom element is routed to your design lead as a flagged exception, with the reason logged, so the standard part of the quote is still produced from rules.
What if dealers quote without our estimator?
Then the dealer needs a price list and a rule sheet in a form they can use alone: the base machine, the compatible options and the limits they cannot go beyond. We write a dealer version of the rules. A dealer who needs something outside it sends a request through the exception route to your estimator, and the quotation is held until the answer arrives.
Our machines are one-off builds. Can rules still work?
Yes, for the parts that repeat. Even a made-to-order machine uses a standard frame, drive or guarding, and the rules cover those. The one-off element is handled by a design check and a costing sheet, and the quotation states the scope plainly. We write the rules for what repeats and leave the rest to the engineer.
How long is the contract?
The term is agreed in writing after we have spoken, along with the fee and the reporting. It is never a default twelve months, and renewal is decided on the numbers against the baseline recorded at the start.
How soon will we see results?
It depends on the trade, the channel and what is already in place. After we have read your brief and spoken to you, we say what we would expect to move first and how it will be measured against the baseline. Nothing here is guaranteed.
Who will actually do the work?
The person you speak to before anything starts. We work from one office in Nagarbhavi, Bengaluru, with no account managers in between.
What do you need from us?
Your brief, and a conversation. After that, access to whatever this work touches, such as your website, your accounts or your enquiry record, and time with the people who handle your enquiries.
What if we are not happy with the work?
Tell us and the plan changes. Everything is reported against the baseline, so a number that is not moving is visible to both sides. The term is in your written scope, and the refund and cancellation policy sets out the rest.

Your next practical step

Tell us what you are trying to grow, and we will read it before we call.

Eight short steps, mostly taps. Skip anything you would rather answer on the call.